Laserfiche WebLink
�. l <br /> Mr. Gau <br /> May 4, 1998 <br /> Page 2 <br /> • Page 7-8. Mitigation Measure T-I: Before each phase of development occurs Caltrans <br /> would like to participate in the evaluation and monitoring of traffic operating conditions 3-�7 <br /> M <br /> on critical roadways and interchanges. <br /> Stockton Metropolitan Ai ort Master Plan Traffic Stud <br /> • Page II-3. The San Joaquin COG Regional Transportation Plan identifies widening <br /> improvements from 4 to 6 lanes on SR 99 from Highway 120 to Arch Road in the 2416- <br /> 2020 years and from Arch Road to Main Street in the 2011-2015 years. Under SB 45 San <br /> Joaquin COG now has authority to set project priorities for regional improvements within <br /> l . San Joaquin County and could possibly advance the SR 99 widening project before the <br /> programmed year. 3' <br /> �I <br /> Currently a Route 99 Major Investment Study Progress Report (MIS) between Jack Tone <br /> Road and Peltier Road is being developed by San Joaquin Council of Governments. Tne <br /> report will identify solutions to design, traffic and environmental problems that currently <br /> exist on SR 99. <br /> Stockton Metropolitan Airuort Traffic Study,,Addendum, Section IX <br /> • Page Adm-61, Mitigation Measures. Under cumulative conditions improvements to the <br /> I-5/Arch-Sperry Road interchange should be considered as a specific project mitigation 3 <br /> measure with the project contributing a fair share to ramp improvements. <br /> F <br /> Thank you for the opportunity to comment on the DEIR for the Stockton Metropolitan <br /> Airport Project. If you have any questions regarding these comments, please contact Chris Sayre <br /> of my staff at(209) 948-7142. <br /> { Sincerely, <br /> CARLOS P. YAMZON, Acting Chief <br /> Ell Transportation Planning Branch B <br /> cc: Andrew Chesley, San Joaquin Council of Governments <br /> 4 <br /> r <br /> } <br /> i <br /> 1 <br /> F <br /> 60950 <br /> I <br />