My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012773
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALFALFA
>
5050
>
2600 - Land Use Program
>
UP-95-18
>
SU0012773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 11:10:16 AM
Creation date
9/4/2019 9:48:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012773
PE
2626
FACILITY_NAME
UP-95-18
STREET_NUMBER
5050
Direction
N
STREET_NAME
ALFALFA
STREET_TYPE
ST
City
LINDEN
Zip
95236-
APN
09121060
ENTERED_DATE
1/3/2020 12:00:00 AM
SITE_LOCATION
5050 N ALFALFA ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\ALFALFA\9518\UP-95-18\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT = Use Permit <br /> .t <br /> Application Information <br /> Owner: Roman Catholic Bishop of Stockton <br /> Applicant: Reverend Armando Vergara <br /> File Number: UP-95-18 <br /> Location: On the northeast corner of Front Street and Alfalfa Street, Linden <br /> Address: 5050 N. Alfalfa Street, Linden <br /> General Plan: R/L Community: Linden <br /> Zoning: R-L APN: 091-210-53, 54, & 26 <br /> Project Size: 1.95 acres Parcel Size: 1.95 acres <br /> Water Supply: Linden Water District Sewage Disposal: Linden Water District <br /> Storm Drainage: None 100-Year Flood: No, Zone B <br /> Williamson Act: No Supervisorial District: 4 <br /> Staff: Chandler Martin CFQA Determination: Negative Declaration <br /> Project Description <br /> This is a Use Permit for additions and modifications to an existing church complex. The two churches <br /> and rectory are existing. The project is to construct four classrooms and a mufti-purpose room. Of the <br /> two existing churches, the older, smaller church is used for Catechism classes, meetings, and storage <br /> and is no longer used for services. The larger church has a capacity for 288 and has services on <br /> Saturday evenings and Sunday mornings. The school rooms have a capacity for 120 students and will <br /> primarily be used for Catechism classes. A full-time private school is not proposed. Catechism classes <br /> will be held on Wednesday evenings and after the 10:30 a.m. Mass on Sunday. The 8160-square-foot <br /> multi-purpose building will be constructed in Phase 2. The project will be built in phases and is to be <br /> completed in three years. Some existing structures will be demolished. <br /> Recommendation <br /> Approval. <br /> San Joaquin County UP-95-18/Roman Catholic Bishop <br /> Community Development Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.