My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALLEN
>
19155
>
2600 - Land Use Program
>
SR0079744
>
SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 1:44:05 PM
Creation date
9/4/2019 9:48:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0079744
PE
2601
STREET_NUMBER
19155
Direction
E
STREET_NAME
ALLEN
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24538039
ENTERED_DATE
10/16/2018 12:00:00 AM
SITE_LOCATION
19155 E ALLEN RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\A\ALLEN\19155\NL STUDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 1.0 CHEMICAL AND PHYSICAL SOIL PROPERTIES..........................................................3 <br /> 1.1 Chemical and Physical Soil Properties.................................................................3 <br /> 1.2 Mass Transport Soil Properties............................................................................4 <br /> 2.0 GROUNDWATER ANALYSIS .........................................................................................4 <br /> 2.1 Regional Groundwater.........................................................................................4 <br /> 2.2 Potential Ground Water Contamination Issues.....................................................5 <br /> 2.3 Current and Future On-Site Ground Water Uses..................................................5 <br /> 3.0 SOURCES AND IMPACT OF NITRATE TO GROUNDWATER.......................................5 <br /> 3.1 Current Off-Site Sources of Nitrate ......................................................................5 <br /> 3.2 Contribution of Rainfall.........................................................................................6 <br /> 3.3 Current On-Site Sources of Nitrate ......................................................................6 <br /> 3.4 Future On-Site Sources of Nitrate........................................................................6 <br /> 3.5 Quantity and Quality of Wastewater from Project.................................................7 <br /> 3.5.1 Denitrification Estimate.............................................................................8 <br /> 3.5.2 Nitrate Loading Scenario..........................................................................8 <br /> 3.5.3 Impact of Nitrate Loading to Nearby Water Sources.................................9 <br /> 4.0 DISCUSSION OF NITRATE LOADING RESULTS RELATIVE TO PROPOSED METHOD <br /> OF WASTEWATER DISPOSAL..................................................................................................9 <br /> 4.1 Total Nitrate Impact..............................................................................................9 <br /> 4.2 Methods of Mitigation...........................................................................................9 <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS................................................................9 <br /> 6.0 LIMITATIONS................................................................................................................10 <br /> APPENDIX A: VICINITY MAP & SITE MAP <br /> APPENDIX B: DEEP PERCOLATION OF RAIN & NITRATE LOADING CALCULATION <br /> APPENDIX C: SOURCE INFORMATION <br /> Responsive ■ Resourceful ■ Reliable <br />
The URL can be used to link to this page
Your browser does not support the video tag.