Laserfiche WebLink
-a <br /> a�gUTAJ c <br /> ' COUNTY OF SAN JOAQUIN THOMAS R. FL1NN <br /> N DEPUTY DIRECTOR <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810- 1810 E. HAZELTON AVENUE THOMAS M. GAU <br /> • <br /> STOCKTON, CALIFORNIA 95201 <br /> ••c¢CjFfl'yi'�` DEPUTY DIRECTOR <br /> (209) 468-3000 <br /> MANUEL LOPEZ FAX (209) 468-2999 <br /> DIRECTOR STEVEN WINKLER <br /> August 3, 2000 DEPUTY DIRECTOR <br /> MEMORANDUM REC ""v.` -t <br /> TO: Kerry Sullivan, Deputy Director AUG 4 2000 <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher Community Development Dept, <br /> FROM: Ben Neely, Engineer 11 t590 <br /> Public Services Division <br /> SUBJECT: LA-00-61 A LOT LINE ADJUSTMENT APPLICATION TO ADJUST LOT <br /> BETWEEN TWO PARCELS. PARCEL ONE TO INCREASE IN SIZE <br /> FROM 1,626 SQUARE FEET AND PARCEL TWO TO DECREASE IN <br /> SIZE FROM 22,671 SQUARE FEET TO 11,336 SQUARE FEET, <br /> LOCATED ON THE EAST SIDE OF ANTEROS AVENUE AT TERMINUS <br /> OF DRAKE. (DISTRICT 2). <br /> APPLICANT: Adam Eigenberger APN: 157-230-20 <br /> INFORMATION: <br /> Anteros Avenue has an existing right-of-way width of 50 feet and a planned right-of-way width <br /> of 50 feet. <br /> RECOMMENDATIONS: <br /> I. A Recorded Deed is allowed, but if points or lines are set, a Record of Survey is required. <br /> (New legal description shall be submitted to Surveyor's office for review.) <br /> (Development Title Section 9-872.4) <br /> 2. New description must reflect correct distance with qualifiers to avoid overlap or gap. <br /> 3. This development is subject to reapportionment under the San,Joaquin Area Flood <br /> control Agency Assessment District No. 96-1 (Flood Protection Restoration Project). An <br /> application requesting the reapportionment of the unpaid portion of the assessment, along <br /> with the payment of the reapportionment fee, shall be provided prior to recording the <br /> Notice of Lot Line Adjustment. <br /> 4. This development is subject to assessments under Improvement District No. 51. <br /> The subdivider shall initiate processing of Segregation of Services. Currently,the <br /> fee for processing the segregation is $310 plus $18 per lot, per Development Title <br /> Section 9-240.2 and Resolution R-91-327. <br /> (Development Title Section 9-1105.3) <br /> BN:SH:mr <br /> PS-OH007-MIF <br /> E: Thomas M. Gau, Deputy Director/Development <br />