Laserfiche WebLink
t <br /> tr <br /> CONDITIONS OF APPROVAL <br /> PA-0700046 <br /> 8ozzano <br /> Use'`0ermiit Application. No '.RA-0700046 was approved by the. San Joaquin County Planning <br /> Gommission:,61 ApH s -2007. The'effective.date of approval is April 15, 2007. This approval will <br /> I expire on October 14 2008,which is'18 rionths from the effective date of approval, unless (1) all <br /> Conditions-of Approval have been complied with, (2) ail necessary building permitshave been <br /> (secured and remain In force, and (3) all necessary permits from other agencies have been secured <br /> and remain m force:' <br /> 1 Unless otherwise specified,all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to;the establishment of the use and the issuance of any building permits. Those Conditions <br /> 1 followed.by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Rick Griffin, [209]468-3154) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT". The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST" for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for an 1,800 square foot building with an attached 900 square <br /> foot covered area for an olive mill processing plant as shown on the revised Site Plan dated March <br /> 16,2007(Use Type: Agricultural Processing—Food Manufacturing). <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> i Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. (Section 7-1000 of the County Ordinance Code) <br /> e. STORM DRAINAGE: Stormwater drainage shall be retained on-site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a.registered civil engineer or architect shall be included. (Development Title Section 9- <br /> 1135) <br /> f. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) Ail parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9- <br /> 1015.5[el) <br /> x <br /> Conditions of Approval - 1 - PA-0700046 <br />