Laserfiche WebLink
2. Mitigation Implementation and Mon itoringProgiram Arch-Sperry Specific Road Plan <br /> Responsible Findings/ Approving <br /> Approving City Staff or Timing Mitigation Measures product/ Significance Staff/ <br /> Agency Body Action After Completion <br /> Mlti alfon Date <br /> NOISE <br /> Impact: Project construction could result in short-term increases in noI's Ie�eis.. <br /> SPW and Directors Throughout N-t, i e. At a minimum, construction Field monitoring 3, PS <br /> SJCPW project noise shall be limited by Implementation of the following measures: during active <br /> construction Construction activities shall generally be restricted to weekdays phases of Rationale: <br /> and Saturdays, .between the hours of 7:00 AM and 7:0DEIR 0 PM. construction pages <br /> Construction.during other time periods would be allowed If It can DEIR <br /> be demonstrated.'that resulting noise would not adversely affect 50-59 <br /> nearby' resident§";.and businesses or If necessary to avoid <br /> significant land use conflicts (e.g.,disruption of a business's utility <br /> service during working hours), <br /> • All construction equipment shall be maintained In accordance with <br /> the inanufacturees specifications and be equipped with properly <br /> fitting muffler systems. r.,. <br /> • Equipment,maintenance'and materials storage shall be conducted <br /> at.designated staging areas. 'One of the considerations In siting <br /> the staging areas shall be to minimize exposure of residences to <br /> nolS!. a <br /> : . r. . <br /> Impact: Pro' construction could result in Ian -term exposure of existing and future uses along the corridor to unacceptable noise levels. <br /> SCDD and Directors Prior to N-2, MlnJmI osur6'of'sUrCgUngi 9 6sesio Noise. Site-specific noise Noise Study 3, PS <br /> SJCPW approval of studies. shall�bejconducted,In,conjunction with final road design to Reports <br /> subsequent better daterrrslne the'extent of nolse Impacts. Feasible measures to <br /> Q - Rationale: <br /> environmental mitigate, adverse,.nolse.Impacts shall be Identified and Implemented.Such measures Imay,�lnelude DEIR pages <br /> documents <br /> use of sound barriers, establishment of X0 IR <br /> minimum buildingsatbacks; establishment of special noise-Insulation <br /> measures for.�riewconstruction, 'sound proofing" existing buildings, <br /> and other measures:, If,mltlgation Is not feasible, the City of Stockton <br /> and/or San JoagUin TbUnty shall 'purchase the affected lands and <br /> make relocation'assistance available to any occupants. <br /> ENPLAN <br /> :r ,r 7 crdt� <br />