My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004857 SSCRPT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARNAUDO
>
175
>
2600 - Land Use Program
>
PA-0400737
>
SU0004857 SSCRPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 2:52:56 PM
Creation date
9/4/2019 9:55:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSCRPT
RECORD_ID
SU0004857
PE
2611
FACILITY_NAME
PA-0400737
STREET_NUMBER
175
Direction
W
STREET_NAME
ARNAUDO
STREET_TYPE
BLVD
City
MOUNTAIN HOUSE
APN
NUMEROUS
ENTERED_DATE
2/22/2005 12:00:00 AM
SITE_LOCATION
175 W ARNAUDO BLVD
RECEIVED_DATE
2/22/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\ARNAUDO\175\PA-0400737\SU0004857\SSC RPT.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pE5p t1p.E5 AGENCY OFCALIFORNIA 688-153 <br /> i DEPARTMENT OF CONSERVATION I No. T <br /> DIVISION OF OlL AND AS <br /> Report on Operations <br /> j Bradley Govreau, Agent <br /> UNION OIL CO. OF CALIFORNIA I <br /> 32.01 Skyway Dr. , Suite 104 Woodland Calif. <br /> i <br /> Santa Maria, CA. 93455 May 26 1988 <br /> i Your operations at well "Arnaudo Bros. " 1 API No-__077-20510 <br /> v, Sec.S T.2S g. 4E M.D. B,& M. --- Field, in San Joaquin <br /> were witnessed on 5/10/88 R. Thesken ��ty' <br /> representative of <br /> the supervisor,was present from 0030 to _ 0200 . There wee also present F. Jones. <br /> Company Representative. <br /> Present condition of well: _ 10-3/4 ' cem 943' • 7" cem 2790' T D (original hole) 3999' .. <br /> T.D. resent hole 2795' . ((Standingcemented) NOTE: Junk in 2nd hole): bit, bit <br /> sub cellars stabilizer, drill pipe 2301'-2854' . <br /> �4 I <br /> r I <br /> ' <br /> The operations were performed for the <br /> r j P P purpose of _ testing the blowout prevention equipment and <br /> installation. <br /> t DECISION: The blowout prevention equipment and its insta lation on the 7" casing <br /> are approved. <br /> NOTE: No deficiencies. <br /> 4 I <br /> i <br /> I <br /> r <br /> y <br /> I <br /> 4 <br /> i <br /> I <br /> I <br /> I <br /> RT/sd <br /> CONFIDENTIAL STATUS <br /> cc: Mark Ivanowicz D <br /> BY <br /> L 04708 (3/83/GSRI/15M) 4ohn C. Su111V3R <br />
The URL can be used to link to this page
Your browser does not support the video tag.