Laserfiche WebLink
S J C O G, Inc. <br /> 555 East Weber Avenue • Stockton.CA 95202 •-(209)235-0600 e FAX(209)235-0438 <br /> San Joaquin County Multi-Species Habitat Conservation&Open Space Plan(SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Giuseppe Sanfilippo,San Joaquin County,Community Development Department <br /> From: Laurel Boyd,SJCOG, Inc. <br /> Date: April 6,2018 <br /> Local Jurisdiction Project Title: PA-0900094(RAA,SA) <br /> Assessor Parcel Number(s): 019-140-40 <br /> Local Jurisdiction Project Number: PA-0900094(RAA,SA) <br /> Total Acres to be-converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Multi-Purpose Open Space and Urban Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist <br /> Dear Mr. Sanfilippo: <br /> SJCOG, Inc. has reviewed the application referral for PA-0900094(RAA, SA). This project consists of a Revisions of Approved <br /> Actions application for a Previously Approved Site Approval apphcaton to revise Condition of Approval 1.b.for a Previously Approved Site <br /> Approval for a small winery and tasting room to include-the addition of twelve(12)marketing events for a maximum of 300 people and the <br /> addition of outdoor amplified sound for the proposed marketing events-and previously approved wine release and industry events. The <br /> project site is on the west side of Atkins Read, 2,665 feet north of Brandt Road, northeast of Lockeford (APN/Address: 019-140- <br /> 40;18921 N.Atkins Road,Lodi). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This project is-subject to the SJMSCP and is located within the unmapped land use area. -Per requirements of the <br /> SJMSCP, unmapped projects are subject to case-by-case review. This can be a 90 day process and it is recommended <br /> that the project applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant <br /> obtain an information package. http:j/www.sjcog.o.-g <br /> After this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following <br /> process must occur to participate in the SJMSCP: <br /> • Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITIvIMs. If T1MMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed nNIMs from project applicant,SJCOG,Inc.staff will sign the rrMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstauce shall ground disturbance occur without compliance and satisfaction of the rfMMs. <br /> 3. Upon issuance of fully executed rrMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> C. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs first,the project applicant must: <br />