Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.13-9 <br /> Forward Inc. Landfill 2014 Expansion Project <br /> Table IV.134 <br /> Existing Peak-Hour Intersection Operations <br /> Existing Conditions <br /> Weekday AM Peak Hour Weekday PM Peak Hour <br /> Intersection Control LOS Delay LOS Delay <br /> (in seconds) (in seconds) <br /> 1. Austin <br /> Rd./Mariposa Signal A 8.1 B 11.5 <br /> Rd. <br /> 2. Austin Signal B 18.5 C 20.2 <br /> Rd./Arch Rd. <br /> 3. Austin Rd./ Minor B A A EB A Del=9.0 B A A EB A Del=8.9 <br /> Forward Street y pp � � Pp y pp � � Pp <br /> driveway Stop Overall = A Avg Del = 4.0 Overall= A Avg Del = 1.7 <br /> 4. Austin Rd./ All- <br /> French Camp Way A 9.9 A 9.9 <br /> Rd. Stop <br /> NB App Del= NB App Del= <br /> 5. SR 99/ French Minor NB App = B 15.0 NB App = C 18.6 <br /> Camp Rd. NB Street SB App =B SB App Del= SB App = B SB App Del= <br /> Ramp Stop Overall = A 11.0 Overall= A 10.3 <br /> Avg Del =4.0 Avg Del = 3.2 <br /> NB App Del= NB App Del= <br /> 6. SR 99/ French Minor NB App = C 15.2 NB App =D 32.8 <br /> Camp Rd. SB Street SB App = C SB App Del= SB App =F SB App Del= <br /> Ramp Stop Overall = A 16.0 Overall = A 51.6 <br /> Avg Del =4.2 Avg Del= 10.0 <br /> Rd.. 99/ Arch Signal B 12.9 B 12.2 <br /> R <br /> 8. SR 99/ <br /> Mariposa Rd. NB Signal B 19.0 B 18.71 <br /> Off-Ramp Only <br /> 9. SR 99/ <br /> Mariposa Rd. SB Signal A 8.2 A 6.1 <br /> Ramp <br /> 10. Mariposa Rd. <br /> NB Ramp Signal B 18.3 B 1 h. <br /> Notes: Level of Service based on worst approach delay for two-way stop controlled intersections and <br /> average delay for all-way stop-controlled and signalized intersections. <br /> Minor Street Stop=Stop sign-controlled. Only the minor street traffic stops. <br /> App=Approach,Avg=Average <br /> Impacts <br /> Traffic impacts are assessed by evaluating the effects of a proposed project on the adequacy of <br /> the transportation circulation system's capacity to accommodate projected traffic levels. This <br /> traffic study focuses on the operation of intersections most likely to be adversely affected by the <br /> proposed project. Cumulative impacts, which would be those resulting from the combined -- <br />