Laserfiche WebLink
5 - <br /> �f <br /> LIST OF FIGURES <br /> IILC-1. Project Location III-3 <br /> IILC-2. Existing Permitted Use sand Site Facilities 11I-4 <br /> l... IILC-3. Forward Landfill Sub-Areas and Waste Management Units III-6 <br /> F <br /> III.C.4. Typical Landfill Liner Schematics III-9 <br /> III.0-5. Existing Permitted Grading Plan I1T-22 <br />� lI1.C.6. Proposed Final Grading Plans III-23 <br /> E <br /> IV.A-1. Williamson Act Contracts IV.A-3 <br /> S.. <br /> IV.A-2. Prime Agricultural Land and Important Farmland IV.A-4 <br /> IV.A-3. Agricultural Preserve IV.A-6 <br /> IV.A-4. General Plan Designations IV.A-S <br /> IV.B-1. Vicinity Map IV.B-2 <br /> IV.B-2. Existing Lane Configurations and Peak-Hour Volumes- IV.13-7 <br /> IV.13-3. Existing-Plus-Approved Projects Peak-Hour Volumes IV.B-9 <br /> IV.13-4. Project Trip Distribution IV.13-13 <br /> IV.B-5. Existing-Plus-Approved-Projects Plus Proposed Project Peak-Hour Volumes IV.B-14 <br /> P <br /> IV.B.6. Cumulative No- Project Land Configurations and Peak-Hour Volumes IV.B-17 <br /> IV.B-7. Cumulative Plus Project Lane Configurations and Peak-Hour Volumes IV.B-19 <br /> J. IV.0-1. Site 1-Austin Road,0.4 Miles North of Landfill Entrance, Monday/Tuesday <br /> March 9/10,2009 IV.0-7 <br /> Fe IV.G-2. Site 1-Austin Road,0.4 Miles North of Landfill Entrance,Tuesday/Wednesday <br /> March 10/11,2009 IV.0-7 <br /> IV.0-3. Site 1-Austin Road,0.4 Miles North of Landfill Entrance, Wednesday/Thursday <br /> March 11/12,2009 IV.0-S <br /> IV.0-4. Site 2-Austin Road, at Landfill Entrance, Monday/Tuesday March 9/10,2009 IV.0-8 <br /> IV.0-5. Site 2-Austin Road at Landfill Entrance Tuesday Y/Wednesda March 10/11 <br /> 2009 IV.0-9 <br /> iii - <br />