i <br /> Draft Environmental Impact Report Page IV.B-22 <br /> Forward Inc. Landfill Expansion <br /> intersects this driveway. Under the near term With Project conditions,this intersection would <br /> operate at LOS C or better (see Table IV.B-8 (Existing Plus Approved Projects Plus Project <br /> conditions)),which constitutes very good operation even with trucks making left turns from the <br /> only through lane. The Cumulative scenarios assume Austin Road would be widened to two <br /> F lanes in each direction. Under Cumulative operations (see Table IV.13-11: 2035 Cumulative Plus <br /> Project conditions) this intersection would operate at LOS C or better, even with trucks turning <br /> ti left from the through lane closest to the median. Current site access appears to be adequate, <br /> and no changes are required. <br /> As part of the project, the main driveway would be relocated to a point farther south on Austin <br /> Road than the existing main driveway. Because the proposed driveway would have essentially <br /> the same configuration as the existing driveway, it also would be expected to operate <br /> acceptably. <br /> The impact of the project on traffic operations at the existing and future main driveways would <br /> be Iess than significant. <br /> Mitigation Measure B.3. None required. <br /> Impact BA. Potential Impacts on Bicycles. <br /> As mentioned in Setting, Bicycles, above, French Camp Road is a proposed Class 3 bikeway. <br /> The proposed project would add a maximum of 8 truck trips in each direction in the AM Peak <br /> Hour to French Camp Road. The truck volume would be lower in other hours. This volume of <br /> trucks would have a less than significant impact on bicycle usage or facilities. <br /> It is possible that added Forward Landfill truck traffic outside the study area may overlap with <br /> bikeways or bicycle usage. However, the added trips would disperse to many roadways <br /> outside the study area, and it is not expected that the increase on any individual roadway <br /> rwould create a significant negative impact. The impact of the project on bicycle travel would be <br /> less than significant. <br /> Mitigation Measure BA. None required. <br /> Impact B.5. Potential Impacts on Public Transit. <br /> i There is no transit service in the study area, so the project would not create any impacts on <br /> transit service under cumulative conditions. The nature of the proposed project is such that it <br /> would also not create any significant demand for new transit service. The impact of the project <br /> y on bicycle travel would be less than significant. <br /> Mitigation Measure B.S. None required. <br /> 1.�. <br /> t�. <br /> 4 <br /> 3 <br />