Laserfiche WebLink
Draft Environmental Impact Report Page 1V.0-5 <br /> Forward Landfill Expansion <br /> Table IV.0-3 <br /> Existing Noise Environment In The Project Area <br /> Location Time Period Ldn and Leg (dBA) Noise Sources <br /> Site 1: Austin Rd., March 9;2:00 24-hour Ldn's =69, Unattended noise <br /> approximately 0.4 p.m. through 69, 68 measurements do not <br /> miles north of March 12,2:00 specifically identify noise <br /> landfill entrance. 40 p.m., 2009 Hourly average sources. <br /> feet east from center Monday- Leq's ranged from: <br /> of Austin Rd. Thursday 46- 70 <br /> 72-hour <br /> measurement <br /> Site 1: Austin Rd., March 9, 2009 5-minute results: Heavy duty trucks and <br /> approximately 0.4 1:55—2:05 Leq's=66, 67 other traffic along Austin <br /> miles north of p.m. L90's=48,48 Rd.,birds chirping, <br /> landfill existing landfill vehicle noises, <br /> entrance. 50 feet including backup <br /> east from center of beepers. Loudest heavy <br /> Austin Rd. truck pass-by resulted in <br /> an Lmax of 82 dBA. <br /> Site 2:Austin Rd. at March 9,2:00 24-hour Ldn's =68, Unattended noise <br /> landfill entrance. 50 p.m. through 68, 68 measurements do not <br /> feet west from March 12,2:00 specifically identify noise <br /> center of Austin p.m., 2009 Hourly average sources. <br /> Rd., south of Monday- Leq's ranged from: <br /> entrance. Thursday 44 -72 <br /> 72-hour <br /> measurement <br /> Site 2:Austin Rd. at March 9, 2009 5-minute results: Heavy duty trucks and <br /> landfill entrance. 50 3:07—3:17 Leq's=66, 65 other vehicles along <br /> feet west from p.m. L90's = 50,51 Austin Rd. and the <br /> center of Austin landfill entrance. A <br /> Rd., south of heavy truck pass-by <br /> entrance. resulted in an Lmax of 81 <br /> dBA. <br /> Site 3:Austin Rd., March 9, 2:00 24-hour Ldn's=65, Unattended noise <br /> approximately 1.3 p.m. through 64,64 measurements do not <br /> miles south of March 12, 2:00 specifically identify noise <br /> landfill entrance. 60 p.m., 2009 Hourly average sources. <br /> feet east from center Monday- Leq's ranged from: <br /> of Austin Rd. Thursday 41 -65 <br /> 72-hour <br /> measurement <br /> Site 3:Austin Rd., March 9, 2009 5-minute results: Heavy duty trucks and <br /> approximately 1.3 2:29—2:39 Leq's=65, 66 other traffic along Austin <br /> miles south of p.m. L90's = 43,44 Rd. A curve in the road <br /> landfill entrance. 50 south of the <br /> feet east from center measurement location <br /> of Austin Rd. forced traffic to slow <br />