Draft Environmental Impact Report Page IV.D-19 <br /> Forward Landfill Expansion <br /> Specific control measures for construction,excavation, extraction, and other earthmoving <br /> activities required by the SJVAPCD include: <br /> • All disturbed areas, including storage piles not actively utilized for construction <br /> purposes, shall be effectively stabilized using water, chemical <br /> stabilizer/suppressant, or covered with a tarp or other suitable cover or vegetative <br /> ground cover in order to comply with Regulation VIII's 20 percent opacity <br /> limitation. <br /> • All onsite unpaved roads and offsite unpaved access roads shall be effectively <br /> stabilized using water or chemical stabilizer/suppressant. <br /> • All land clearing, grubbing,scraping, excavation, land leveling, grading, cut and fill, <br /> and demolition activities shall be effectively controlled utilizing application of <br /> water or by presoaking. <br /> • When materials are transported offsite, all material shall be covered, or effectively <br /> wetted to limit visible dust emissions, and at least six inches of freeboard space <br /> from the top of the container shall be maintained. <br /> • All operations shall limit or expeditiously remove the accumulation of mud or dirt <br /> from adjacent public streets at the end of each workday. However, the use of <br /> blower devices is expressly forbidden, and the use of dry rotary brushes is <br /> expressly prohibited except where preceded or accompanied by sufficient wetting <br /> to limit the visible dust emissions. <br /> • Following the addition of materials to, or the removal of materials from,the surface <br /> of outdoor storage piles, said piles shall be effectively stabilized utilizing sufficient <br /> water or chemical stabilizer/suppressant. <br /> • Within urban areas, trackout shall be immediately removed when it extends 50 or <br /> more feet from the site and at the end of each workday. <br /> • Any site with 150 or more vehicle trips per day shall prevent carryout and trackout. <br /> Enhanced and additional control measures for construction emissions of PM,p shall be <br /> implemented where feasible. These measures include: <br /> • Limit traffic speeds on unpaved roads to 15 'Mph. <br /> • Install sandbags or other erosion control measures to prevent silt runoff to public <br /> roadways from sites with a slope greater than one percent. <br /> • Install wheel washers for all exiting trucks, or wash off all trucks and equipment <br /> leaving the site. <br /> • Install wind breaks at windward side(s)of construction areas. <br /> • Suspend excavation and grading activity when winds exceed 20 mph. <br /> • Limit area subject to excavation, grading, and other construction activity at any one <br /> time. <br /> The applicant shall implement feasible control measures during construction to mitigate <br /> NO,,and ROG emissions from construction equipment, which may include: <br /> • Require construction equipment used at the site to be equipped with <br /> catalysts/particulate traps to reduce particulate emissions.These catalysts/traps <br />