Laserfiche WebLink
' Draft Environmental Impact Report Page IV.E-14 <br /> p p g <br /> N Forward Inc. Landfill Expansion Project <br /> Metals <br /> Arsenic—5.0 x 101 <br /> ' Beryllium—7.5 <br /> Cadmium—1.0 x 101 <br /> Chromium III—4.0 x 102 <br /> Copper-2.2 x 102 <br /> ` Lead-5.0x101 <br /> Mercury—2.0 <br /> Nickel—2.0 x 102 <br /> � f <br /> Zinc—9.2 x 101 <br /> The soil exposure pathways were deemed incomplete for the purposes of the risk assessment. To <br /> mange both on-and off-site impacts due to the on-site aeration or treatment of contaminated <br /> ,. soils, the concentration of chlorinated hydrocarbons in the soil will be restricted to lower levels <br /> than those assumed in the health risk assessment. <br /> Implementation of these measures would reduce the impact to a less-than-significant level. <br /> Mitigation Measure E.8: None required. <br /> �t <br /> y <br /> I <br /> �7 <br /> } <br /> E <br /> 4' <br /> 4 <br /> �t <br /> 1 <br />