Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page 11-46 <br /> Forward Inc. Landfill 2014 Expansion Project <br /> vegetation in Mitigation Measure (b) above would not shield residents and <br /> motorists along Austin Road from night lighting, the project sponsor shall <br /> install temporary screens at the working face to block night lighting from <br /> residences and motorists along Austin Road. <br /> Impact K.6.The Proposed as Part of the Project: Less than <br /> proposed project would Significant <br /> extend the life of the Daily inspection will be conducted to control litter on- and off-site, including <br /> landfill and the the North and South Branches of the South Fork of Little Johns Creek, <br /> associated potential of approach roads,entrance facilities, the transfer station/resource recovery <br /> debris and litter along facility, portable litter control fences, landfill perimeter fence, leachate <br /> access roads and at the impoundments, and storm water facilities including ditches,berms, and <br /> site from transporting detention/sedimentation basins. <br /> and handling of waste. <br /> • All trucks will be tarped upon entering and exiting the facility. This policy <br /> will be strictly enforced. In accordance with San Joaquin County Ordinance <br /> No. 2887, adopted September 29, 1981 (Title 5 Health and Sanitation, <br /> Division 2.Solid Waste Collection and Disposal, Section 5-2502), tarps will be <br /> placed over open loads to avoid littering during transport of waste. <br /> • Management of the daily working fill face to the smallest practical area with <br /> immediate compaction to minimize the area and debris subject to the <br /> impacts of wind. <br /> • If possible, on windy days the daily fill face tipper location would be selected <br /> for its protection to minimize effects of wind (i.e., tipper facing into wind <br /> adjacent to the leeward sidewall, or sheltered by completed fill deposits). <br /> • Waste that is more susceptible to windblown distribution may, on windy <br /> days,be worked immediately into the fill face and covered with a layer of <br /> daily cover, as needed, or the waste may be excluded from the site. <br /> • Portable skid-mounted litter fences may be provided for deployment <br /> downwind as close as practical to the working area, as needed. <br />