Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-48 <br /> Forward Inc. Landfill 2014 Expansion Project <br /> the litter will be picked up on a routine basis. All necessary safety <br /> precautions will be followed. <br /> • Before and after photos of any litter removal effort may be taken in the event <br /> anyone questions the level of effort spent on litter collection. <br /> • Site management's cell phone numbers along with the office number may be <br /> provided to community/neighbors. <br /> K.7. Excavation, moving, Identified in This EIR: Less than <br /> and depositing soil for Implement the fugitive dust control procedures and mitigation measures identified Significant <br /> daily cover of the in Mitigation D.I. <br /> additional waste <br /> disposed under the <br /> proposed project could <br /> create visible dust and <br /> haze in the vicinity of the <br /> project. <br /> � I I <br />