Laserfiche WebLink
Page 7 J <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURE LEVEL OF <br /> SIGNIFICANCE <br /> AFTER <br /> MITIGATION <br /> r buffer eye-level views of facility <br /> structures,vehicles and equipment from <br /> adjacent roadways and residences. <br /> i <br /> (d)If feasible,the angular top and side <br /> z slopes of the landfill shall be rounded to , <br />! 5 create more naturalistic contours,and <br /> hydroseeded with a mixture of native <br /> r# grasses and wildflowers that would <br /> visually blend with plants around the <br /> project site. <br /> FB.2 Realignment of Little Johns Creek None required LS <br /> would impair the view. (LESS THAN <br /> SIGNIFICANT) n <br /> B.3 The proposed project would generate (a)A 6-foot chain link fence or other LS <br /> additional sources of light and glare in the fencing approved by the County would be <br />' project site. (SIGNIFICANT) constructed at the perimeter of the facility <br /> so that public access(and access to these <br /> views)would be limited. <br /> (b) The facility would continue to operate <br /> i only during daylight hours so that <br /> excessive amounts of light would not be <br /> ° generated by the project. <br /> (c)The use of highly reflective surface <br /> materials in constructing structures on the <br /> site shall be restricted.,Exterior building <br /> materials shall be painted or otherwise <br /> treated with muted earthtone colors. <br /> (d)At any time in the development of the <br /> expanded landfill when additional lighting <br /> ' is proposed,preliminary lighting designs <br /> should be sent to the Northern California <br /> t l Women's Facility for review and <br /> comments. <br /> B.4 The proposed project would extend the (a)Refuse would be compacted and LS <br /> number of years of landfill operations and covered as soon as possible after <br /> therefore extend the number of years for disposition to reduce amounts of blowing <br /> the potential of debris and litter along litter. <br /> access roads and at the site during - , <br /> transporting and handling of material. jJb Portable litter control fences would be <br /> F, GRAS=ENVIRONMENTAL CONSULTING <br />