Laserfiche WebLink
A <br /> IMPACT/WrIGATION MEASURES IMPLEMENTATIONMONITORINGIREPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMINGISCHEDULE TIMING <br /> number of years the current number of vehicles <br /> travel to and from the site,thus increasing the need <br /> for Highway and traffic patrol and accident <br /> response. No mitigation measure is warranted. <br /> C.2 The proposed project would expand <br /> the boundaries of the existing landfill,thus <br /> increasing the area that must be secured for crime- <br /> prevention and safety reasons. <br /> (a)The landfill operator supervisor would (a)SJCCDD will inform the (a) SJCCDD staff,during site visits, <br /> be responsible for providing overall site security operator supervisor of his will verify that adequate site <br /> during normal working hours. responsibility for providing security is being provided by the <br /> overall site security during operator. Any required <br /> normal working hours. improvements will be brought to <br /> the attention of the operator <br /> supervisor. <br /> (b) All areas and facilities,other than those (b) SJCCDD will inform the (b) SJCCDD staff,during site <br /> expressly designated for use by haulers,would be operator which areas of the visits,will verify that access to the <br /> considered as restricted areas. landfill are to be designated restricted areas of the landfill is <br /> as restricted areas. Operator limited to authorized personnel and <br /> will take the necessary steps vehicles. <br /> to keep unauthorized <br /> personnel and vehicles out <br /> of the restricted areas. <br /> (c) The landfill would have a perimeter barrier or (c)Operator shall have a (c) SJCCDD staff,during site visits, <br /> topographic constraints designed to discourage perimeter barrier or shall verify that the perimeter <br /> unauthorized entry by persons or vehicles. topographic constraints barrier or topographic constraints <br /> installed at the landfill as are in place and operating as <br /> part of the initial expansion designed. <br /> project. <br /> 11 <br />