Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORT ING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMINGISCHEDULE TIMING <br /> disseminate safety information. operator to conduct weekly operator is conducting weekly <br /> safety meetings and to safety meetings. <br /> maintain a log of such. <br /> meetings. <br /> (c) Provide personal protective gear for the safe (c)LEA shall direct the (c)LEA shall verify that the <br /> handling of solid waste: Also please refer to Impact operator to provide personal operator has provided personal <br /> L I protective gear for the safe protective gear for the safe handling <br /> handling of solid waste. of solid waste, Also please refer to <br /> Also please refer to the monitoring/reporting and timing for <br /> implementation Impact L.1. <br /> responsibility and- <br /> timing/schedule for Impact <br /> L. <br /> CA The proposed project would create and <br /> recover leachate that could in the future be treated <br /> at the MUD wastewater treatment plant,thus <br /> increasing treatment flow at the wastewater <br /> treatment plant. <br /> (a) If leachate is delivered to the MUD wastewater (a)If leachate is delivered to (a)If leachate is delivered to the <br /> treatment plant,the project sponsor would provide the MUD wastewater MUD wastewater treatment plant, <br /> independently corroborated test results to MUD to treatment plant, LEA shall LEA shall review test results with <br /> demonstrate the chemical composition of the provide independently MUD to verify that the leachate is <br /> leachate extracted from the Austin Road Landfill. corroborated test results to acceptable for treatment at the <br /> A monitoring plan would be established by the MUD to demonstrate the wastewater treatment plant. LEA <br /> project sponsor that would meet the requirements of chemical composition of the shall review the monitoring plan <br /> the City of Stockton Wastewater Ordinance and leachate extracted from the with MUD to ensure that it meets <br /> MUD for continued testing of leachate. Austin Road Landfill. their requirements. LEA shall <br /> establish a monitoring plan that <br /> would meet the requirements of the <br /> City of Stockton Wastewater <br /> Ordinance and MUD for continued <br /> 13 <br />