My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012793
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
EIR-99-2
>
SU0012793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 12:22:48 PM
Creation date
9/4/2019 10:03:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012793
PE
2675
FACILITY_NAME
EIR-99-2
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106005
ENTERED_DATE
1/6/2020 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR-99-2\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EAPACTIMITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMINGISCIIEDULE TIMING <br /> long-term management of Swainson's hawk I specified fees before. <br /> foraging and nesting habitat within San Joaquin issuance of a construction <br /> county,the owners, developers and/or successors in permit of initiation of site <br /> interest to any applicable undeveloped portion of improvements,whichever <br /> the project site shall pay any specified fees,or occurs first. <br /> otherwise verify compliance with adopted financing <br /> mechanism(s),prior to the issuance of any <br /> construction permit or initiation of site <br /> improvements,whichever occurs first. Payment of <br /> those fees or other financing mechanism(s)shall be <br /> in-lieu of entering into a separate habitat <br /> mitigation/management agreement with CDFG. <br /> F.4. Implementation of the proposed project <br /> may result in the loss of a Swainson's hawk <br /> breeding territory and disturbance of nesting <br /> Swainson's hawks. <br /> (a) Preconstruction surveys for Swainson's hawks (a) SJCCDD shall require (a) SJCCDD shall verify that <br /> shall be conducted by the SJMSCP JPA. that construction activities appropriate monitoring is <br /> be monitored as specified. conducted <br /> (b) Implement Mitigation Measures F.I (a-b): (b)Please see F.I. (b)Please see F.l. � <br /> Planting of native tree species in association with <br /> the Wetland Mitigation and Monitoring Program <br /> and along the landfill perimeter and buffer area <br /> would provide potential future nesting substrate for <br /> the Swainson's hawk, including after anticipated <br /> closure of the proposed landfill in 2045. <br /> (c) Implement Measure 17.3 (c),above to mitigate (c) See Mitigation F.3 (c) (c) See Mitigation F.3 (c)above. <br /> for habitat loss. above. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.