Laserfiche WebLink
IMPACTIMITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMINGISCHEDULE TIMING <br /> $1,500 per acre. For the conversion of 213.9 acres developers,or their their successors at interest has paid <br /> of Agricultural Lands,the property owners, successors at interest pay appropriate fees to the SJSCMP <br /> developers,or their successors at interest shall pay appropriate fees as Joint Powers Authority <br /> $320,850 or other fees as calculated by the calculated by the SJMSCP <br /> SJMSCP Joint Powers Authority(JPA)to the JPA Joint Powers Authority <br /> to fund acquisition of preserve lands for covered (JPA)to the JPA. <br /> species that could potentially be affected } <br /> F.8. Construction activities in the North <br /> Branch of the South Fork of Little Johns Creek <br /> could result in significant adverse impacts to <br /> Sacramento River winter chinook salmon. <br /> (a) To avoid impacting Sacramento River winter (a) SJCCDD shall require (a) SJCCDD shall monitor <br /> chinook salmon in Little Johns Creek,all proposed that construction work be construction work and verify that it <br /> work that would impact this creek should occur in scheduled as specified in the is conducted according to the <br /> the summer months when this salmon would not be mitigation measure. mitigation measure. <br /> migrating/spawning in this creek. If work must <br /> occur during the fall/winter months,the National <br /> Marine Fisheries Service(NMFS) should be <br /> contacted for other possible mitigation <br /> requirements. ) <br /> (b) Other mitigation would include conducting (b) SJCCDD shall require (b) SJCCDD shall verify that <br /> turbidity studies to determine if the work would be that turbidity studies be turbidity studies are done,and <br /> detrimental to Sacramento River winter chinook conducted,and that monitor construction,that <br /> salmon. Further mitigation for non-summer work additional mitigation be additional mitigation be conducted <br /> would be in accordance with recommendations conducted in accordance in accordance with NMFS <br /> provided by NMFS. with NMFS recommendations <br /> recommendations. <br /> F.9. Construction activities in the North <br /> Branch of the South Fork of Little Johns Creek <br /> could result in significant adverse impacts to <br />