Laserfiche WebLink
Page 29 <br /> 'ENVIRONMENTAL IMPACT MITIGATION MEASURE <br /> LEVEL OF <br /> SIGNIFICANCE <br /> AFTER <br /> MITIGATION <br /> (b) The liner and leachate collection <br /> systems for the expansion have been <br /> designed to meet or exceed the regulatory <br /> requirements. <br /> a (c) The project includes a leak detection <br /> system,a series of secondary collection <br /> trenches beneath the liner and directly <br /> under the leachate collection trenches. <br /> (d)The operator would remove hazardous <br /> materials spotted during delivery,thus <br /> minimizing the potential for leachate <br /> F contamination if there is a break in the <br /> ! liner or the leachate collection trenches. <br /> (e)The landfill operator would include <br /> practices and procedures in the Solid <br /> ' Waste Facilities Permit to comply with AB <br /> 1760. The procedures would describe how <br /> the expanded landfill would salvage all <br /> F l economically feasible metallic discards. l <br /> K.6. Project activities that increase (a) The extraction wells developed as part LS <br /> leachate production from the existing of the CAP shall be maintained and <br /> F landfill materials during various phases - monitortd during Phases V and VI,to be <br /> could alternatively facilitate the employed as needed for the extraction of <br /> remediation of local groundwater,or result any residual contamination by leachate. f <br /> in groundwater contamination. <br /> (SIGNIFICANT) <br /> K.7. Surface and/or groundwater (a)Maximum preloaded settlement of the LS <br /> contamination could result if differential existing landfill would provide the <br /> settlement damaged the liner and/or maximum period for settlement, and would <br /> leachate collection system of the vertical take advantage of anticipated <br /> expansion portion of the landfill(Phases V improvements in geosynthetic technology <br /> and VI).(SIGNIFICANT) _ that would occur over the next 35 years. r <br /> i <br /> (b)The final design for the vertical <br /> expansion would,if necessary, include <br /> additional components in the liner system, <br /> depending on future differential settlement <br /> on the liner system. <br /> i f <br /> 4 V Y T (c) The extraction wells developed as part <br /> of the CAP shall be maintained and <br /> GRASSETTI ENVIRONMENTAL CONSULTING <br /> 1. ; <br />