Laserfiche WebLink
IMPACT/NIITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMINGISCHEDULE TIMING <br /> (a) A landfill gas monitoring system would be (a)Operator shall include a (a)LEA shall verify that the final <br /> installed around the landfill. landfill gas monitoring construction plans for the landfill <br /> system around the landfill as expansion include a gas monitoring <br /> part of the design of the system around the landfill as part of <br /> landfill expansion. the design of the landfill expansion. <br /> LEA shall verify that gas ID <br /> monitoring system is installed <br /> around the landfill. <br /> (b) The existing gas extraction system would (b)Operator shall ensure (b) LEA shal I verify that the <br /> continue to operate. continued operation of the construction plans for the landfill <br /> existing gas collection expansion provide for the continued <br /> system. operation of the existing gas <br /> collection system. LEA shall verify <br /> that the existing gas collection - <br /> system continues to operate. <br /> (c) A landfill gas control or recovery system would (c)LEA shall design a (c)LEA shall verify that the <br /> be installed. landfill gas control or construction plans for the landfill E <br /> recovery system for the expansion provide for a landfill gas <br /> project. control or recovery system. LEA { <br /> shall verify that the landfill gas <br /> control or recovery system is <br /> installed. <br /> (d) Gas accumulations in on-site buildings or (d)LEA shall require the (d) LEA shall review the <br /> beneath temporary buildings shall be prevented by regular monitoring to detect monitoring Iog with the operator <br /> regular monitoring. any gas accumulations in on- and take appropriate action as <br /> site buildings or necessary. <br /> beneath temporary <br /> buildings. A written log of <br /> all site monitoring shall be <br /> 57 <br />