My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012793
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
EIR-99-2
>
SU0012793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 12:22:48 PM
Creation date
9/4/2019 10:03:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012793
PE
2675
FACILITY_NAME
EIR-99-2
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106005
ENTERED_DATE
1/6/2020 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR-99-2\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPACT/NIITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMINGISCHEDULE TIMING <br /> (a) A landfill gas monitoring system would be (a)Operator shall include a (a)LEA shall verify that the final <br /> installed around the landfill. landfill gas monitoring construction plans for the landfill <br /> system around the landfill as expansion include a gas monitoring <br /> part of the design of the system around the landfill as part of <br /> landfill expansion. the design of the landfill expansion. <br /> LEA shall verify that gas ID <br /> monitoring system is installed <br /> around the landfill. <br /> (b) The existing gas extraction system would (b)Operator shall ensure (b) LEA shal I verify that the <br /> continue to operate. continued operation of the construction plans for the landfill <br /> existing gas collection expansion provide for the continued <br /> system. operation of the existing gas <br /> collection system. LEA shall verify <br /> that the existing gas collection - <br /> system continues to operate. <br /> (c) A landfill gas control or recovery system would (c)LEA shall design a (c)LEA shall verify that the <br /> be installed. landfill gas control or construction plans for the landfill E <br /> recovery system for the expansion provide for a landfill gas <br /> project. control or recovery system. LEA { <br /> shall verify that the landfill gas <br /> control or recovery system is <br /> installed. <br /> (d) Gas accumulations in on-site buildings or (d)LEA shall require the (d) LEA shall review the <br /> beneath temporary buildings shall be prevented by regular monitoring to detect monitoring Iog with the operator <br /> regular monitoring. any gas accumulations in on- and take appropriate action as <br /> site buildings or necessary. <br /> beneath temporary <br /> buildings. A written log of <br /> all site monitoring shall be <br /> 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.