Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> J <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE "` TIMING <br /> (b) The landfill would continue to ban tires,which (b) LEA would direct the `(b) During site visits, LEA shall <br /> collect water and serve as a breeding ground for operator to continue toybaci� verify that the operator is <br /> vectors,and large dead animals from disposal at the tires and large dead,animals continuing to ban tires and large <br /> landfill. from disposal at the landfill. dead animals from disposal at the <br /> landfill. <br /> (c) The landfill operator would continue to reduce (c),LEA shall direct the (c)During site visits, LEA shall <br /> the seagull nuisance by using auto firing cannons, operator to continue to verify that the operator is <br /> firing cracker shells from a hand gun, and playing reduce the seagull nuisance continuing to reduce the seagull ' <br /> tape recordings of a seagull in distress. Suspended by using auto firing cannons, nuisance by using auto firing <br /> wires would be used if additional control measures firing cracker shells from a cannons, firing cracker shells from <br /> are needed. hand gun, and playing tape a hand gun,and playing tape <br /> recordings of a seagull in recordings of a seagull in distress. <br /> distress. Suspended wires Suspended wires would be used if <br /> would be used if additional additional control measures are <br /> control measures are needed. needed. <br /> (d):.The LEA shall periodically monitor the landfill (d)The LEA shall (d)The LEA shall review <br /> -for the presence of vectors. LEA inspections shall periodically monitor the inspection reports and if deemed <br /> be documented in the administrative file. landfill for the presence of necessary,take appropriate <br />- vectors. LEA inspections measures to reduce the presence of <br /> shall be documented in the vectors at the landfill. <br /> administrative file. <br /> L.6. The project,by incrementally adding 1 ` <br /> to local landfill gas generation,would have a <br /> cumulative public health impact. <br /> (a) Please see Mitigation Measure LA. See implementation See monitoring/reporting <br /> responsibility and responsibility and timing for <br /> timing/schedule for Mitigation Measure LA. <br /> Mitigation Measure L.4. <br /> 59 <br />