Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page III-21 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> Waste Composition <br /> ' For the period 2013-2017,waste disposed at the Forward Landfill consisted of:" <br /> Municipal solid waste 65.8% <br /> Class II miscellaneous waste 13.0% <br /> Cover Material 8.0% <br /> Green waste 4.0% <br /> Ash 3.8% <br /> Class II soil 2.2% <br /> Sludge 1.5% <br /> Asbestos 0.8% <br /> Treated Wood waste 0.5% <br /> Construction and demolition waste 0.37o <br /> Waste Origin <br /> For the period 1995-2017,waste disposed at the Forward Landfill originated from:12 <br /> San Joaquin County 317o <br /> Sacramento County(adjacent) 33% <br /> Stanislaus County (adjacent) 1217o <br /> Alameda County (adjacent) 57o <br /> Santa Clara County 47o <br /> El Dorado County 3% <br /> All Other Counties Combined 127o <br /> Existing Landfill Storage and Support Facilities <br /> Existing support facilities at the two landfills consist of an entrance facilities area, two scale <br /> houses and three scales,two water production wells,maintenance and storage areas, a transfer <br /> station/materials recovery building, a landfill gas-fired electrical generation plant, a <br /> groundwater extraction and treatment system, a landfill gas flare station, leachate evaporation <br /> basins, a tire wash, and sedimentation/detention ponds. <br /> The main scale house is located at the center of the eastern boundary of the existing Forward <br /> Landfill site. A second scale house and scale are located in the southeastern portion of the <br /> landfill (to serve the resource recovery facility). <br /> "Sangeeta Lewis,Prinicpal,Lewis Engineering,Letter report to Kevin Basso,General Manager,Forward,Inc., <br /> Subject:Forward,Inc. Landfill,Infill Development Project;Summary of TonnagelSite LifelWaste OriginlWaste <br /> Type,August 22,2018. <br /> 12 Sangeeta Lewis,Prinicpal,Lewis Engineering,Letter report to Kevin Basso,General Manager,Forward,Inc., <br /> Subject:Forward,Inc.Landfill,Infill Development Project,Summary of TonnagelSite LifelWaste OriginlWaste <br /> Type,August 22,2018. <br />