Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page I-5 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> ' compatibility) and agricultural resources, biological resources, water quality, traffic, noise, <br /> air quality, and health risk. The NOP and written comments received during the scoping <br /> period are included in Appendices A and B. <br /> E. USES OF THIS SUPPLEMENTAL EIR <br /> ' This document is a project-level Supplemental EIR for the 2018 Forward Landfill Expansion <br /> Project. Its primary use is to provide CEQA-compliant review of any substantive changes to <br /> the proposed project, existing conditions, impacts, or mitigation measures identified in the <br /> 2013 EIR that have been identified since certification of the 2013 EIR. <br /> Under CEQA, a responsible agency is an agency other than the lead agency that has a legal <br /> responsibility for carrying out or approving a project or elements of a project (Public <br /> Resource Code [PRC] Section 21069). Responsible agencies are encouraged to actively <br /> participate in the CEQA process of the lead agency, review the CEQA documents of the lead <br /> agencies, and use the documents when making decisions on the project. Possible CEQA <br /> responsible agencies for components of this project that are proposed to change include: <br /> • U.S.Army Corps of Engineers(USACE) <br /> • U.S Fish and Wildlife Service <br /> • California Department of Resources Recycling and Recovery(CalRecycle) <br /> • California Department of Water Resources <br /> • Central Valley Flood Protection Board <br /> • San Joaquin County Environmental Health Department <br /> • San Joaquin County Department of Public Works <br /> • San Joaquin County Flood Control and Water Conservation District <br /> • California Department of Fish and Wildlife <br /> • Central Valley Regional Water Quality Control Board <br /> • San Joaquin Valley Unified Air Pollution Control District <br /> • Manteca-Lathrop Fire Department <br /> ' Specific permits and approvals required from these agencies, as well as federal agency <br /> permits and approvals, are listed in Chapter II. Project Description. <br /> ' F. REPORT ORGANIZATION <br /> This Supplemental EIR is organized into the following chapters: <br /> Chapter 1 — Introduction: Discusses the overall purpose of the Supplemental EIR; summa- <br /> rizes the organization of the document; discusses the function of a Supplemental EIR as de- <br /> scribed in the CEQA Guidelines. <br /> ' Chapter 2— Summary: summarizes the original and revised Project, and any changes in im- <br /> pacts that would result from implementation of the 2018 Expansion Project. <br /> Chapter 3—Project Description: Provides background information about the Project, includ- <br /> ing the Project's environmental review history; existing conditions at the Project site; the ob- <br /> jectives and physical characteristics of the Project; and changes to the entitlements that <br />