Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page I1-15 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> C.3. On-Site Landfill Mitigation Measure C.3. The Landfills all implement one oft e following two Less than <br /> Equipment Noise options e to mitigate this potentially significant impactFes : Significant <br /> (a) Heavy equipment operations shall not be conducted within 1,500 feet of any <br /> occupied residence after 10 p.m. and before 7 a.m.;or <br /> (b)Equipment operations within 1,500 feet of any residence after 10 p.m. or before 7 <br /> a.m. shall be fully shielded from the direct line of sight to the residence by an <br /> earthen berm whose crown elevation exceeds the elevation of the top of the exhaust <br /> stack. <br /> CA. Cumulative Traffic Mitigation Measure C.2.would minimize noise increases(for residences that Significant and <br /> Noise Impacts implement the soundproofing),however,th-us no mitigations Unavoidable <br /> guarantee reducing all noise increases for this cumulative impact other than <br /> reducing project operations. Such a reduction would be a substantial change to the <br /> proposed project and therefore is addressed as a component of Alternative 2B <br /> (Reduced Size/Reduced Daily Operations Alternative) in Chapter V of the 2013 <br /> FEIR(see Alternative 6). Therefore,the project's noise increment is considered to <br /> be cumulatively considerable and the cumulative traffic noise impact is considered <br /> significant and unavoidable. <br /> D.AIR <br /> QUALITY/ODORS/ <br /> CLIMATE CHANGE <br /> Mitigation Measure D.1. The applicants all comply with Regulation VIII Rule Less t an <br /> D.1.Initial construction 8011 and implement the following control measures during construction: Significant <br /> particulate matter(PM10) <br /> and equipment exhaust • The applicant shall submit a Dust Control Plan subject to review and <br /> emissions. approval of the SJVAPCD at least 30 days prior to the start of any <br />