Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page III-2 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> In 2012, Forward proposed an expansion of the landfill,which included a horizontal expansion <br /> of landfilling operations onto the adjoining 184-acre "Brocchini" parcel. This project entailed <br /> the following substantial modifications to previous landfill characteristics and procedures: <br /> • Expand the Forward Landfill to contiguous parcels including an approximately 184-acre <br /> parcel to the southwest of the existing landfill site and an approximately 10-acre parcel <br /> in the northeast of the existing landfill. In addition, approximately 11 acres of currently <br /> permitted landfill disposal area in the southern portion of the Forward Landfill would <br /> be relocated within the currently permitted landfill boundary due to realignment of the <br /> South Fork of South Littlelohns Creek. <br /> • Increase the remaining landfill capacity by approximately 32.0 million cubic yards (cy) <br /> to approximately 54.0 million cy. All of the increase would be Class II landfill space and <br /> would extend the landfill closure date to approximately 2039.' <br /> • Relocate approximately 3,000 feet of the South Fork of South Littlejohns Creek(which <br /> currently traverses the landfill)to the southeastern boundaries of the site to provide <br /> additional separation of the creek from the landfill.The relocated creek will be <br /> approximately 3,400 feet in length. <br /> • Allow cannery waste processing in areas of site that are not being used for disposal at <br /> the time. <br /> The proposed 2013 expansion project would have allowed landfilling activities within 10,000 <br /> feet of the end of the usable runway of the Stockton Metropolitan Airport, and required a four- <br /> fifths vote of the Board of Supervisors to override the County Airport Land Use Commission <br /> finding that this proposed expansion project was not in conformity with the 1993 San Joaquin <br /> County Airport Land Use Plan. This former project failed to achieve the required vote to <br /> override. However,the Board of Supervisors certified the Forward Landfill Expansion Final <br /> Environmental Impact Report(San Joaquin County, May 2013) ("FEIR")in compliance with the <br /> California Environmental Quality Act(CEQA). <br /> In 2014, Forward proposed a smaller increase in permitted landfilling capacity that did not ' <br /> include the previously proposed expansion of landfilling operations on the 184-acre Brocchini <br /> parcel.This proposed increase in landfill acreage was entirely within the boundary of the 567- ' <br /> acres permitted under the current land use permit(UP-00-0007/ER-00-0002) approved by the <br /> Board of Supervisors on April 8, 2003. The 2014 Expansion Project included the following <br /> changes: <br /> • Allow landfilling operations on an 8.7-acre portion of the 10-acre parcel(described in the <br /> 2013 EIR)that lies in the northeast portion of the site within the currently permitted landfill <br /> boundary. (The remaining 1.3 acres of the 10-acre parcel is occupied by a landfill gas-to- <br /> energy plant and is not proposed for landfill.) In addition,approximately 6.2 acres of <br /> landfill disposal area were proposed to be added to the currently permitted landfill <br /> 'The 2013 FEIR estimated closure dates with and without that project of 2039 and 2021,respectively. <br /> However,2014 estimated closure dates with and without the 2012 pr-ev eusl •^r-eigese )2013 FEIR project <br /> are 2045 and 2026,respectively. <br /> 1 <br />