My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004350 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AVENA
>
17399
>
2600 - Land Use Program
>
PA-0200224
>
SU0004350 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 11:19:07 AM
Creation date
9/4/2019 10:06:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004350
PE
2632
FACILITY_NAME
PA-0200224
STREET_NUMBER
17399
Direction
E
STREET_NAME
AVENA
STREET_TYPE
RD
City
ESCALON
APN
20319006
ENTERED_DATE
5/17/2004 12:00:00 AM
SITE_LOCATION
17399 E AVENA RD
RECEIVED_DATE
6/6/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AVENA\17399\PA-0200224\SU0004350\SS STDY.PDF \MIGRATIONS\A\AVENA\17399\PA-0200224\SU0004350\NL STDY.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fact Sheet No. 7 For Dairies Page 2 <br /> Construction of Animal Waste Holding Ponds <br /> t The actual construction of an animal waste holding pond may be done by a contractor that is not a registered <br /> civil engineer. However, the contractor cannot perform the duties of a civil engineer including: <br /> • the selection and comparison of engineering alternatives; <br /> • the selection or development of design standards or methods, and materials to be used; <br /> • the selection or development of techniques or methods of testing to be used in the evaluation of ' <br /> construction methods or controls; <br /> • the evaluation of test results, materials, and workmanship affecting the integrity of the completed <br /> + work; or <br /> • the development and control of operating and maintenance procedures. <br /> Documentation of Pond Construction and Operation <br /> The facility owner should retain records documenting that animal waste holding ponds are adequately <br /> constructed and maintained. Such documentation includes <br /> J <br /> any report describing assessments of soil and <br /> groundwater conditions in the vicinity of the pond <br /> prior to the start of pond construction; <br /> • a report summarizing the sampling procedures and the reported analytical results for soil samples <br /> 1. collected from the pond excavation and from any clay liner used in the pond; <br /> • engineering specifications for the pond and, if applicable, the pond liner and an engineers <br /> f t description of any maintenance activities necessary to maintain the pond integrity; <br /> • documentation that the pond was constructed according to the design specifications. Such <br /> # documentation may include photographs, inspection logs, test results documenting proper <br /> }. construction of any liner, and an engineer's statement describing the completed pond; <br /> • documentation that the pond has been maintained according to the design specifications. Such <br /> j documentation may include inspection logs and records of pond`cleaning and maintenance <br /> activities. <br /> Contacts for Further Information <br /> For more information about the water quality programs that.apply to confined animal facilities in the <br /> Central Valley, contact Regional Board dairy regulatory staff at the following offices: <br /> • Sacramento (916) 255-3000 <br /> • Fresno (559) 445-5116 <br /> • Redding (916) 224-4845 ` <br /> 5 <br /> FS-a7.oOC <br /> ! <br /> � z <br />
The URL can be used to link to this page
Your browser does not support the video tag.