|
Ed Nunes Dairy Site Precipitation/Evaporation Calculations waste charts -Ph II
<br /> Job#096-06 Nutrient/Flush Lagoon
<br /> Monthly Rainfall For Location(Inches)
<br /> Oct. Nov. Dec. Jan. Feb, Mar. Apr. May June July Aug.. Sep.
<br /> 0.70 1.80 2.00 2.60 1.70 1.60 1.00 0.10 0.10 0.10 0.10 0.20
<br /> Monthly Pond/Lagoon Evaporation Rates for Location(Inches)
<br /> Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sep.
<br /> 3.87 1.62 0.88 1.11 1.88 3.63 6.37 8.13 8,75 9.63 9.63 6.50
<br /> Monthly Site(roof)concrete/yard/corral/ACI landscape)Evaporation Rates for Location(inches)
<br /> 0.70 1.62 0.88 1.11 1.70 1.60 1,00 0.10 0.10 0.10 0,10 0.20
<br /> Monthly Evaporation rates From Evaporation Field(inches)(Not Applicable):
<br /> 2.47 OA0 0.00 0.00 0.00 0.00 4.37 7.93 8.55 9.43 9A3 6.10 'j
<br /> Rainfall Area(sq.ft.)&Monthly Corral Evaporation
<br /> Actual %of Runoff Weighted sq.ft for rainfall %of Evaporation Weighted Sq.Ft.for evap. Evaporation Field Information
<br /> Roof .^ 3421'it)t; 100% 342110 0% 0
<br /> Concrete-'r 46 700.; 100% 45700 5% 2285 Evaporation field 7
<br /> Yard ,� �343,83�� 15% 51575 0% 0
<br /> °6 of monthly evap.
<br /> Corrals: z 435'450" 25% 108863 0% 0
<br /> AC: 126,1t& 95% 119795 0% 0
<br /> Lagoon a= 227 50D; 100% 227500 100% 227500
<br /> Sett.Pond a 95 D00:? 100% 95000 100% 95000
<br /> Landscape ' fi' 10% 0 0% 0
<br /> Total Sq.Ft: 1,615,691 sq,.ft 990542 sq.ft. 324785 sq.ft.
<br /> Rainfall into system for Month(gals)
<br /> Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sep.
<br /> 432,207 1,111,388 1,234,876 1,605,339 1,049,644 987,901 617,438 61,744 61,744 61,744 61,744 123,488
<br /> Evaporation from Nutrient/Flush Lagoon and Settling Ponds(gals)
<br /> 777,967 325,661 176,902 223,138 377,927 729,721 1,280,529 1,834,333 1,758,969 1,935,871 1,935,871 1,306,663
<br /> Evaporation for site(gals)
<br /> 997 2,307 1,253 1,581 2,421 2,279 1,424 142 142 142 142 285
<br /> Evaporation at evaporation field(gals)
<br /> Page 11
<br />
|