Laserfiche WebLink
F41' <br /> WATER SAMPLING PROCEDURES <br /> Irrigation Requirements r <br /> Fi <br /> Liquid manure will be sampled prior to pumping from the retention pond. <br /> Samples will be taken near the outlet for irrigation water and analyzed for total- <br /> nitrogen. <br /> Nutrient Monitoring <br /> I <br /> To provide base data for future comparison and determine amounts of liquid ! <br /> manure to be added to the soil to provide a balance of elements for optimal plant <br /> growth and nutrient uptake, water samples will be taken at those locations shown <br /> i <br /> on the Site Map.(Appendix B). <br /> F. The water samples will be analyzed (using A&L Laboratories' <br /> Basic Water � <br /> Package (W76) called "Lagoon Water Analysis") for Total Kjeldahl Nitrogen I <br /> (TKN), Total Phosphorus (as P20s), Total Phosphorus (as K20), Nitrate Nitrogen <br /> (NO3-N), and for Ammonia Nitrogen (NH4-N). <br /> FThe groundwater samples collected from the domestic wells will be analyzed <br /> S (using A&L Laboratories' Basic Water Package (W3) called "Domestic <br /> Suitability") for Purity (total and fecal coliform), Calcium, Magnesium, pH, Total <br /> F" Hardness, Electrical Conductivity, Total Dissolved Solids (calculated), and for <br /> Nitrate. <br /> The groundwater samples collected from the irrigation wells will be analyzed for <br /> Sodium Calcium Magnesium, Chloride,, Electncal Conductivity, Sulfate, Nitrate, � <br /> pH, Carbonate, Bicarbonate, Phosphorus, Potassium, Boron, Total Dissolved <br /> Solids (calculated), and for Adjusted SAR. <br /> I <br /> 1 <br /> Water samples will be acquired within clean plastic containers provided by <br /> i laboratory. <br /> Each plastic container will be labeled with the project name, sample ID, date, and <br /> F time of sample collection, placed in a cooler on water ice at a temperature of 4 . <br /> degrees Celsius (checked using a thermometer), for transport to a State Certified ; <br /> analytical laboratory under chain of custody. <br /> F <br /> Sampling and analyses will be performed to provide baseline data regarding the <br /> concentration of the above-mentioned chemicals at the present time. In order to <br /> I evaluate any potential impact the facility may have on water, soil, and crop and <br /> determine amounts of liquid manure to be added to the soil'to provide a balance <br /> of elements for optimal plant growth and nutrient uptake, water sampling and <br /> 4 i analyses will be done yearly. <br /> F <br /> Fil <br />