My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0056541 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BACON ISLAND
>
17247
>
2600 - Land Use Program
>
SR0056541 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 1:16:25 PM
Creation date
9/4/2019 10:11:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0056541
PE
2602
FACILITY_NAME
BULL FROG MARINA
STREET_NUMBER
17247
STREET_NAME
BACON ISLAND
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
12917013
ENTERED_DATE
2/17/2009 12:00:00 AM
SITE_LOCATION
17247 BACON ISLAND RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BACON ISLAND\17247\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUND DEPTHS <br /> Aggfegate Absorption-Area thickness=-9 in:- <br /> (6 <br /> nr(6 in.of aggregate below the laterals, 1 in.for pipe height and 2 in,for cover over pipe=9 inches) <br /> Thickness of Topsoil(Fill and Cap)at the north and south edges of Aggregate Absorption Area = 12 in. <br /> Thickness of Topsoil (Fill and Cap)at the center of the Aggregate Absorption Area= 18 in. <br /> NORTH DOWN-SLOPE WIDTHI <br /> ( ) <br /> Mound side slope=of 3:1-,o. <br /> Height of mound=(18 in.Fill+9 in. Aggregate Absorption Area + -15 in. Avg. Topsoil thickness) <br /> Height:=.=3.5,ft. vertical x 3.horizontal= 10.5 ft:-Use 10 ft as referenced above. <br /> SOUTH UP-SLOPE WIDTH (J) <br /> Mourid-sicde slope of 3:1`. <br /> Height of mound=(18 in.Fill+9 in. Aggregate Absorption Area + -15 in. Avg.Topsoil thickness) <br /> Height=3.5 ft. vertical x 3 horizontal= 10.5 ft. Use 10 ft as referenced above. <br /> END-SLOPE LENGTHS AT EAST AND WEST ENDS(K) <br /> mound end slope of 3:1 <br /> K=3((18 in. + 18 in.)-2+9 in. + 18 in.) <br /> K= 11.3 ft. Use 11.0 ft <br /> OVERALL LENGTH AND WIDTH(L+W) <br /> L=B +2K <br /> L =63 ft+2(11 ft) <br /> W=A+I+J <br /> W = 10ft+ 10ft+ l0ft <br /> W"-30 ftp <br /> SOIL COVER <br /> The soil cover may consist of on-site peat surface soil (USCS = om) material. However, this <br /> material is extremely difficult to work with. Consequently,,it-is--our-strong-recommendation that a <br /> more-manageable-material-such as-a-sandy-silt-should be-imported-for the soil'cap;or cover. If <br /> landscaping of the mound is desired, drought tolerant grass may be planted on the mound. Instant <br /> sod lawn grass will help prevent erosion of the soil cap, but may retard <br /> evaporation/evapotranspiration. As referenced, the slopes must not exceed 3:1, which wil_ l-place <br /> the-height-of-the mound'at approximatel ,threee feet higher than surrounding ade. <br /> D. MOUND SYSTEM OPERATIONAL COMPONENTS <br /> CONFIGURATION OF PRESSURE DISTRIBUTION NETWORK <br /> The distribution of piping must discharge the effluent uniformly over the gravel bed, with three-foot spaced <br /> k orifices so that effluent application area is --4 W/orifice. Force main (transport line) piping will be to <br /> center-feed manifold. Laterals connect to the manifold by"cross construction" and not"tee-to-tee." <br /> There will be a total of six laterals -three on each side of the manifold, 2.5 feet apart. Orifices shall be pre- <br /> drilled with a sharp drill and installed facing up, with orifice shields. Clean-outs at the distal ends of the <br /> six laterals will extend upward towards the ends of the mound with control valves at the"turn-up" and with <br /> access boxes, as shown on the Plans. <br /> 16 <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.