Laserfiche WebLink
TABLE OF CONTENTS <br /> TABLEOF CONTENTS.........................:.......................................................................................1 <br /> 1.0 INTRODUCTION .....................................................................................................................2 <br /> 2.0 CHEMICAL AND PHYSICAL PROPERTIES OF SOIL........................................................2 <br /> 3.0 GROUNDWATER....................................................................................................................3 <br /> 3.1 Hydrology......................................................................................................................3 <br /> 3.2 Groundwater Contamination Discussion.......................................................................3 <br /> 3.3 Current Groundwater Use..............................................................................................4 <br /> 4.0 SOURCES AND CALCULATED IMPACT OF NITRATE TO GROUNDWATER.............4 <br /> 4.1 Current Off-site, Up Gradient Sources of Groundwater................................................5 <br /> 4.2 Impact of Rainfall to the Project Site.............................................................................5 <br /> 4.3 Current Onsite Sources of Nitrate..................................................................................5 <br /> 4.4 Proposed Future Onsite Sources of Nitrate....................................................................5 <br /> 4.5 Mass Balance of Nitrate/Nitrogen Loading Using Hantzsche/Finnemore Model........6 <br /> 5.0 NITRATE LOADING RESULTS & PROPOSED METHOD OF DISPOSAL.......................7 <br /> 5.1 Nitrate Impact from Proposed Project ...........................................................................7 <br /> 5.2 Methods to Mitigate Impacts to Soil and Groundwater.................................................7 <br /> 6.0 CONCLUSIONS AND RECOMMENDATIONS....................................................................7 <br /> 7.0 LIMITATIONS..........................................................................................................................7 <br /> FIGURES: <br /> FIGURE 1 ASSESSORS PARCEL MAP <br /> FIGURE 2 EXPLORATION MAP <br /> APPENDICES: <br /> APPENDIX A SOIL BORING LOGS <br /> APPENDIX B PERCOLATION TEST RESULTS <br /> APPENDIX C GEOTRACKER REPORTS <br /> APPENDIX D SELECTED PAGES FROM SANTEC/GEOTRACKER REPORTS <br />