Laserfiche WebLink
CONSTRUCTION TESTING & ENGINEERING, INC. <br /> y 16 GEOTECIINICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECIION <br /> NII VINEYARD AVENUE SUITE ESCONDIDO CA 9 2 0 2 9 11601 746-491f <br /> @TRai1lD.ayYV <br /> PROJECT: 26550 Banta Road,Tracy Ct. DRILLER: All Stu SHEET: I Gf _ <br /> CTE JOB NO. 20-24630 DRILL ML-THOD: 4"Augcr DRILLING DAie 12118/13 <br /> LOGGED BY: A.Krause SAMPLE METHOD: SPT/Bulk ELEVATION: EGS <br /> CZ c <br /> e r = N s BORING. B-1Loboreto -n <br /> Tests <br /> G 1 j <br /> DESCRIPTION <br /> 0 ac VeEK oas q_cla eDILA [4. --- ------- <br /> 2 <br /> 4 CL Stiff,damp,dark brown,medium plastic CLAY PP>4.5 TSP <br /> 5 <br /> 5 T <br /> 3 CL Medium stiff,dump,brown,medium plastic CLAY PP=2-5 -3.0 isf <br /> 4 <br /> 0- <br /> 2 CI. Medium cliff,damp,brown, low plastic,silty CLAY PP= 1.5 TSF <br /> 4 <br /> 5 <br /> 2 CL Medium stiff,damp,brown,low plastic,silty CLAY PP= 1.0 TSF <br /> 4 <br /> Total Depth= 16.5 Feet <br /> No free groundwater encountered <br /> Boring backfilled 12/18/2013 <br /> i <br /> i <br /> i <br />