Laserfiche WebLink
.i <br /> C. Construct an individual sewage disposal system(s) under a <br /> permit and inspection by the Environmental Health Division at <br /> the time of development. A septic system must be installed on <br /> each lot within the sewage disposal.. area upon construction of <br /> the residence. This septic system must meet San Joaquin <br /> County Standards for individual disposal systems which include <br /> a septic tank and a double leach field system provided with <br /> alternating distribution box. <br /> i <br /> d: Submit an improvement plan to the San Joaquin County Planning <br /> Department for approval by the Environmental Health Division <br /> showing sewage and well information as required by the f <br /> improvement plan. <br /> e. Connection to an approved public water supply system is <br /> required. No building permits can be issued until the <br /> production wells are in place, accepted by San Joaquin County <br /> Public Works and permitted by the Environmental Health <br /> Division. <br /> I <br /> I <br /> a <br /> f <br />