Laserfiche WebLink
{ , Coelho & Bacchetti -2- , July 19, 2000 <br /> I <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to II <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs on the <br /> new scope of work. <br /> • Although I have referred to the Geological Technics Inc. proposal in my pre-approval above, please <br /> be aware that you will be entering into a private contract: the State of California cannot compel you <br /> I to sign any specific contract. This letter pre-approves the costs as presented in the revised proposal <br /> " - =^^=dated'Jul'y i8,2000=byteiSlisgical Tectinic3'Inc:'for coiiductingth€work=nlsppiF6ved'by tlze`Countyfor='�� --- <br /> implementing the March 15,2000,Geological Technics Inc.workplan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids,or a bid <br /> waiver from Fund staff,from qualified firms for all necessary corrective action work. The legislation <br /> governing the Fund requires that the Fund assist you in procuring contractor and consultant services for <br /> corrective action. If you need assistance in contracting for corrective action services 'don't hesitate to call <br /> me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before <br /> you will be reimbursed. Please insure that your consultant prepares their invoices to include the <br /> required break down of costs on a time and materials basis, that invoiced tasks are consistent with the <br /> original proposal, and that reasonable explanations are provided for any changes made in the scope of <br /> work or increases in the costs. When the invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions, I can be reached at(916)227-4518. <br /> Sincerely, 01 <br /> J <br /> Wennilyn Fua, Water Resources Control Engineer . <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc: Ms. Margaret Lagorio <br /> San Joaquin County EHD <br /> V� P.O.Box 2009 <br /> Stockton, CA 95201 <br /> CsGfornia Environmental Protection Agency <br /> �.a Recycled Paper - <br /> tt <br />