My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003072
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BEYER
>
2097
>
2600 - Land Use Program
>
SA-93-40
>
SU0003072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:39 AM
Creation date
9/4/2019 10:23:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003072
PE
2633
FACILITY_NAME
SA-93-40
STREET_NUMBER
2097
STREET_NAME
BEYER
STREET_TYPE
LN
City
STOCKTON
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
2097 BEYER LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\B\BEYER\2097\SA-93-40\SU0003072\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Suggested Air Quality Dust Mitigation Measures <br /> (for Construction Sites) <br /> Pre-Construction - Emissions generated during the pre-construction process are of a <br /> concern to the District. The following dust control practices should be implemented: <br /> ► All material excavated or graded should be sufficiently watered to <br /> prevent excessive amounts of dust. Watering should occur at least <br /> twice a day with complete coverage, preferably in the late morning and <br /> after work is done for the day. <br /> ► All clearing, grading, earth moving, or excavation activities should cease <br /> during periods of high winds greater than 20 mph average over one hour. <br /> ► All material transported off-site should be either sufficiently watered or <br /> securely covered to prevent excessive amounts of dust. <br /> ► The area disturbed by clearing, earth moving, or excavation activities <br /> should be minimized at all times. <br /> ► Where acceptable to the fire department, weed control should be <br /> accomplished by mowing instead of discing, thereby leaving the ground <br /> undisturbed and with a mulch covering. <br /> During Construction - After clearing, grading, earth moving, or excavation operations, <br /> during the construction phase, fugitive dust emissions should be controlled by the <br /> following methods: <br /> ► All inactive portions of the construction site should be seeded and <br /> watered until grass growth is evident. <br /> ► All active portions should be sufficiently watered to prevent excessive <br /> amounts of dust. <br /> General Fugitive Dust - At all times, fugitive dust emissions should be controlled using <br /> the following procedures: <br /> P. On-site vehicle speed should be limited to 15 mph. <br /> IN. All areas with vehicle traffic should be watered periodically or have <br /> petroleum-based palliatives' applied for stabilization of dust emissions. <br /> ► During rough grading and construction, streets adjacent to the project <br /> site should be swept at least once per day, or as required by the <br /> Revised 1/15/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.