My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006502 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
23751
>
2600 - Land Use Program
>
PA-0700133
>
SU0006502 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:28 AM
Creation date
9/4/2019 10:24:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0006502
PE
2626
FACILITY_NAME
PA-0700133
STREET_NUMBER
23751
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
APN
25010003
ENTERED_DATE
4/3/2007 12:00:00 AM
SITE_LOCATION
23751 S BIRD RD
RECEIVED_DATE
4/3/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\23751\PA-0700133\SU0006502\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S = Sufficient <br /> I = Insufficient <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> ❑ 6.1 Site ma howingCthe loccatiarl,with concise and accurate dimensions of the percolation test holes on the parcel. <br /> ❑ 6.2 The min unmnnnm eer of Ns allow and deep percolation tests was performed for each parcel. <br /> ❑ 6.3 Descri(�iodf the date,time and protocol used to prepare the test hole,including depth and dimensions of hole, <br /> preps (oyn�of le,and depth of water used to presoak(minimum 12 inches). <br /> 0- El 6.4 Descnib of the date,time and condition of the test hole after the 24-hour soak period(hole still intact, hole dry, <br /> depth to wa ernI 'ng in hole,etc.) <br /> El 6.5 The test co oKed tollSJC Policy EHD 02-02(correct depth,diameter, 2"gravel, 6"water refill,correct readings <br /> recorded). <br /> 10 ❑ 6.6 Complete P/sof tiod n Test Form (including readings)+mss grovided with RIS verification signature. The rate <br /> was correctly calculated using the last reading. 7 r <br /> ❑ 6.7 Discussio an potential problems predicted and/or then for y p p p need o an engineered or aftemative septic system. <br /> ® ❑ 6.8 Discussid of er lation rates in relation t th <br /> p sp o e type, size and location of future leach fields needed at the site. <br /> i <br /> 7.0 CONCLC�SION SECTION <br /> X ❑ 7.1 The report w s signed and stamped by the appropriately registered individual <br /> i <br /> Reviewed By: Reviewed Date: 4z <br /> d t5 <br /> i <br /> I <br /> I <br /> i <br /> i <br /> 1 <br /> ERD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br /> ��i♦nnn� <br />
The URL can be used to link to this page
Your browser does not support the video tag.