Laserfiche WebLink
FIELD PURGE DATA <br /> L Monitoring Wells <br /> L client: Te;({e r 1 e- �P 4,�+ Date: <br /> Project:�i.G.�r�� M'Lrri t+ t. Project No.: <br /> Well ID: S. L if -L4 Measured By: -11, 1( <br /> TOTAL WELL DEPTH(ft) CASING DIAMETER(in) STICKUP(ft) STATIC WATER LEVEL(ft) <br /> i PVC/Steel <br /> STANDING,WATER COLUMN(h) o65 <br /> 1r 4•na nny:to Ra s• � WET CASINO VOLUME,VC(gal) 3 Vc(gal) <br /> x 1.41(fm 8".,.g%2.61(for 8•ninny _ <br /> 4.08(8s 10•cams);5.88(for Ir.,.0 <br /> 10 45 a.,16'a.i '.16.92 for 20- ) <br /> Pumping Pump Cu mnlative Sp.Cood. Observations <br /> Clock Flow Rate DTW Temp Turbidity DO ORP <br /> Time Time Rate (8Pm) Flow (R) PH at 25°C (NTU) (mg/L) (milliVoly (redo:,color <br /> (min) (He) (gals) (Palcm) odor.etc.) <br /> 21. 7 k3 S 3,47 <br /> to 0 7A1 644.( 2,S3 5,3J J? t 1 lr <br /> Water Sample Collection(number of bottles and sample I.D.) <br /> n � >� 14 SNS <br /> L <br /> LUHDORFF 8,SCALMANINI <br /> CONSULTING ENGINEERS <br /> 500 FIRST STREET,WOODLAND,CA 95695 <br /> (530)661-0109 Fax:(530)661-6806 Pugc___of _ <br />