My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007907 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
36314
>
2600 - Land Use Program
>
PA-0900206
>
SU0007907 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 4:33:59 PM
Creation date
9/4/2019 10:27:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007907
PE
2631
FACILITY_NAME
PA-0900206
STREET_NUMBER
36314
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
APN
26508013 14
ENTERED_DATE
9/11/2009 12:00:00 AM
SITE_LOCATION
36314 S BIRD RD
RECEIVED_DATE
9/11/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\34497\DELETE\PUB REC REL APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Fl. Introduction <br /> Luhdorff and Scalmanini, Consulting Engineers(LSCE)has prepared this 2012 Groundwater Monitoring <br /> Report on behalf of Teichert Aggregates(Teichert)and Granite Construction Company(Granite)for their <br /> quarry excavation operations in the Vernalis area of southern San Joaquin County, California(Figure 1). <br /> Teichert's plant is located at 36314 South Bird Road, Tracy,CA 95304 (Figure 2). The plant operates <br /> r under Quarry Excavation No. QX-91-5 (Teichert's permit)for the Lone Tree I through VII properties/ <br /> phases. Lone Tree II mining commenced in 1998. Granite's plant is located south of the Lone Tree II <br /> property at 37400 South Bird Road,Tracy,CA 95304. Granite's plant operates under its Revised <br /> Conditional Use Permit for Quarry Excavation and Excavation Plan No. QX-94-1 (Granite's permit)and <br /> its approved Groundwater Monitoring Plan(LSCE,2009). Phase I mining commenced in late 2007. <br /> All phases of the excavation are permitted for dry pit operations. The maximum mining depth at the <br /> facilities shall not exceed 150 feet below ground surface(bgs). Actual allowed mining depths may be <br /> reduced by San Joaquin County based on groundwater level elevation data developed by the monitoring <br /> program. <br /> Between 1995 and 2008,Teichert submitted annual groundwater monitoring reports for compliance <br /> purposes for its Lone Tree quarry excavation operations. This 2012 Groundwater Monitoring Report was <br /> prepared to satisfy both Teichert's and Granite's permit requirements related to groundwater monitoring <br /> and reporting activities. <br /> V <br /> These properties are cumulatively known as Vernalis Central. <br /> ©LLF[x] S SCALMI INI <br /> CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.