Laserfiche WebLink
it r <br /> z0TACHMENT B <br /> AMENDED CONDITIONS OF APPROVAL <br /> (CX-94-IISROWN, SAND) <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT: (Staff Contact: Kerry Sullivan, 468-3140) <br /> a. PROJECT: This approval shall be for a phased 50-year excavation to a depth of 150 <br /> feet of the 379,66-acre site, as shown on the approved reclamation plan. <br /> b. RECLAMATION PLAN: The Mining and Reclamation Plan shall be prepared by a <br /> registered Civil Engineer, showing drainage, driveway access details, on-site parking, <br /> existing and proposed utility services, grading, and reclamation. Storm drainage runoff <br /> shall be retainedo g <br /> on the site. The drainage pattern and corresponding storm drain <br /> improvements shall be shown .on the Plan. A plan check fee as specified by Section 9- <br /> 240 will be required. The Mining and Reclamation Plan shall be <br /> Preparedared <br /> in accordance the reclamation standards developed pursuant to Surface and Mining Reclamation <br /> Act (SMARA) Section 2T3 <br /> b <br /> ( ) and approved by all agencies with permit authority prio�to <br /> initiating the use, <br /> c. STOCKPILING: No stockpiled soil or material shall be placed ;loser than 25 feat to a <br /> property,boundary. (Development i itle Section 9-14.15.3('b1) <br /> d• PRIVATE ROADS: All private roads involved in an excavation shall be maintained to <br /> control the creation .of dust. The >irst .100 feet of any private road on the property that <br /> intersects with a publicly maintained road shall be surfaced in a manner approved by the <br /> Director. Traffic-control and waming signs shall be installed, if -required, at such <br />'F intersections. The placement and size of these signs shall be approved by the Director <br /> of Pubiic Works. (Development i be Section 9-1415.3[cl) <br /> e. EROSION CONTROL; Protective vegetative planting, silt screen dams; or other <br /> 4 approved methods shah be required where necessary for the contral of erosion. An <br /> erosion and sediment control plan approved by Development Services Division small be <br /> Part of the reclamation pian. (Development Title Section 9-1415.3[dj) <br /> f• PERrORMANCE S ANDARDS: Standards contained in Cwapter 9-1025 she€l be met <br /> unless otherwise modified by conditions of the Quarry E,Ycavatlon Permit. (Development <br /> Title Section 9-141.5.3[31) <br /> g- HOURS OF OPERA7]ON: Permitted excavation, processing, and loading-out activities <br /> shall be allowed to take placs 24 hours per day, seven days per week, (Development <br /> Title Section 9-1415.3rq) <br /> h. REMOVAL OF TOPSOIL: The topsoil may be removed from the site. (Development <br /> Title Section 9-1415.3(g1) <br /> i• WEED CONTROL: If <noxious weeds are on the site, operations shall be in accordance <br /> with instructions from the Agricuitural COmmiS5ioner of San Joaquin County. <br /> (Development Title Section 9-1415.3 [h[} <br />