Laserfiche WebLink
V <br /> r" <br /> ww.v <br /> I immediate potential for structures on the adjacent property), the excavation shall <br /> f at no time be closer to the property line than a line projected on a slope of one to <br /> one from the property line to the toe of slope. <br /> [o) =final Slopes, r=inaf cut and/or fill slopes shall not exceed two (2) feat horizontal <br /> k. <br /> to one (1) foot vertical, except as specified below; <br />€ (A) Final slopes to a maximum of one and one-half feet horizontal to one <br /> foot vertical may be maintained when site-specific geologic and <br /> f engineering analysis demonstrates through a slope stability analysis that <br /> E the prcposed final slopes will have a minimum slope stability factor of <br /> safety as required in Section 9-1415.2(k)(4), while demonstrating <br /> I suitability for the proposed end use and protecting against erosion (by <br /> means of revegetation or other methods appreved by the Development <br /> Services D€vision). <br /> (� III Slopes. r=ill slopes shill be constructed consistent with recommendations <br /> from a qualified civillgeotechnical engineer based upori site-s¢ecific geologic <br /> conditions. <br /> L PONDING: All water utilized in the <br /> is <br /> nt operation shall be discesed °i- <br /> behind a cios„dp <br /> dike. Development Title Section 9-1415.3[n]) <br /> `.;. m. EXCAVATIONIRECLAMATION SCHEDULE: The reclamation plan shall show the <br /> phases of excavation. Reclamation on one phase of an excavation shall be initiated <br /> prior to the start of the next excavation phase. The renal reclamation of any phase of <br /> excavation shall be camp€eted within two years of the commencement of the <br /> reclamation process. Excavation shall be limited so that at any point of time a maximum <br /> of one phase IS being reclaimed while One phase is being excavated. ' (Development <br /> Titie.Section 9-1415.3[o]) <br /> n. T€ME — A <br /> LIMITATION: h_ <br /> ' f Quarry Excavation Permit shall remain in effect as long as the <br /> excavation continues 'in compliance with the approved Permit but not to exceed 50 <br /> years. (Development Title Section 9-1415.3 [p]) <br /> o. ANNUAL INSPECTION ,REPORTS; Annual inspections of the excavation shall be <br /> conducted by the County to ensure compliance with the conditions of the permit and the <br /> reclamation plan. The County may Lisa professional services as provided for in Section <br /> 0.11. The consultant shall be selected <br /> by San Joaquin County. Upon completion of <br /> the annual inspection, the person in charge of the mining operation shall submit to the <br /> State Geologist and the County a report which shall contain all the information as <br /> required by Section 2207 of the Public Resources Code. The cost of the inspection sha€I <br /> be paid by the mine operator. Additional inspections may be conducted, but the cost of <br /> additional inspections shall be paid for by the mine operator only if non-compliance with <br /> the conditions of the Quart' Excavation Permit or the reclamation plan is found. <br /> (Development Title Section 9-1413.3rgl) <br /> P_ PERFORMANCF- GUARANTcE: In order to ensure reclamation of the site, cornpiiance <br /> { with conditions of approval, and compliance with County and State mining regulations, <br /> the apoiicant shall provide performance guarantees as a condition of the issuance of the <br /> Quarry Excavation Permit. The amount and form of the guarantee shall he subject to <br />