Laserfiche WebLink
i a <br /> g' <br /> i <br /> j <br /> 3 <br /> (9) Gravel strips or wheel washers shat€ be installed where vehicles enter and exit <br /> unpaved roads onto Paved roads. <br /> (16) All internal roads planned for long-terra use shall be paved. <br /> (11) Excess fugitive windblown dust shall be prevented by planting the proposed row <br /> crops as quickly as possible after excavation activities for.each phase have been <br /> completed. <br /> I (12) Ali on-site equipment driven by internal combustion engines shall be property <br /> maintained and well tuned according to manufacturers' specifications. <br /> Maintenance records demonstrating this shall be kept on. the site by the <br /> f proponent and shall be made available to the County upon request. <br /> (13) Employees shall be encouraged to ride share or carpool-to the job site to reduce <br /> the amount of vehicle traffic to and from the project area_ <br /> (14) During smog season (May through October), the construction period shall be- <br /> lengthened to minimize the number of vehicles and equipment otyerating at the <br /> same level. <br /> (13) When ava'riabie, clean diesel cowered or electric nQUlDment shall be utilized in <br /> t <br /> lieu Of l25QiIhe powered arrglnes: <br /> 4. U.S..FISH AND Villi DL t= SERVICE (Staff Contac: Sheila Larson, {910} 979-2e25) <br /> a. ENDANGERED SPECIES ACT: In carrying out the operation of the proiect, 'the <br /> applicant shall :oke no actions that violate the provisions of the State or Federal <br /> Endangered Species.Act or any regulations promulgated pursuant thereto. 'Compliance <br /> with sold laws shall be the saie responsibility of the applicant, and the applfeant agrO_es to <br /> indemnify, defend, and hold the County harmless from and against any claim or action <br /> by affected State or f=ederal agencies as to the project's compliance with said laws. <br /> b. SAN JOAQUIN COUNTY MULTI-SPECIES HA>'31TAT CONSERVATION AND OPEN <br /> SPACE PLAN (SJMSCP): As an alternative to the are oration of a separate HCR, <br /> , P pthe <br /> aooiicant rnay o <br /> participate in, and Drovide mitiaticn <br /> ,. _ through the SJMSCP. <br /> STATE C)E=AR7MEN7 OF FISH AND GAiv1E• (Staff Contact: Dan.Gifford. 309-8831) <br /> a. PRECONSTRUCTION SURVEYS: Within oQ days prior to the beginning of construction <br /> activities, or any project activity likely to imcact the burrowing owl, cit fox, and/or <br /> l-iospital Creek corridor habitat, the proponent shall retain a qualffiea biologist to conduct ' <br /> 2 preconstruction survey of the affected area. <br />