My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004697
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
37282
>
2600 - Land Use Program
>
QX-94-0001
>
SU0004697
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 9:26:50 AM
Creation date
9/4/2019 10:28:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004697
PE
2656
FACILITY_NAME
QX-94-0001
STREET_NUMBER
37282
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
APN
26512006, 16, &
ENTERED_DATE
11/16/2004 12:00:00 AM
SITE_LOCATION
37282 S BIRD RD
RECEIVED_DATE
11/15/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\37282\QX-94-01\SU0004697\PUB REC REL APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised .Conditions for QX-94-1 (Granite Construction) <br />' Th'e Revisions of.Approved Actions to QuarryExcavation Application No. QX-94-1.was approved,by <br /> E the Planning Commission on The effective date of ,approval is .: This approval will <br /> expire on._ which is 98,m9fithis from the date of a . <br /> pproval, unless (1) all Co`ndrtions.of Approval <br /> have been;com.,p led with;(2) all necessary:building permits have been secured and remain m:force; <br /> and{3]all necessary.permits from other agencies have been <br /> 'secured and remain in force. <br /> p <br /> Unless oth"ise specified, all Cond�tions:of Approval and ordinance requirements shall be fuilfilled. <br /> prror to the establishment of the use and the Issuance:of any b6ildfng permits :Those Con fitions <br /> ed'!by,a Section NUM66r h;�ave'been identified-as ordinance :requirem' 6n'is pert nent'ao`tliis <br /> application Ordlnance.,requlrements cannot be modified; and; other ordinance requirements may' <br /> ,aPplY <br /> 1 COMMUNITY.DEVELOPMENT DEPARTMENT (Staff Contact: Keviri Swanson,.468-%53) . <br /> a. PROJECT: This approval shall be for a phased 50-year.excavation,to a depth of 150 <br /> feet of the 379.66-acre site,as shown on the approved reclamation plan. <br /> b. RECLAMATION PLAN: The Mining and Reclamation Plan shall be prepared by a <br /> registered Civil Engineer, showing drainage, driveway access details, on-site parking, <br /> existing.and proposed utility services, grading, and reclamation. Storm drainage runoff <br /> shall be retained on the site. The drainage pattem and corresponding storm drain <br /> improvements shall be shown on the Plan. A plan check fee as specified by Section 9- <br /> 240 will be required. The Mining and Reclamation Plan shall be prepared in accordance <br /> with the reclamation standards developed pursuant to Surface and Mining Reclamation <br /> Act (SMARA) Section 2773(b) and approved by all agencies with permit authority prior to <br /> initiating the use. <br /> C. STOCKPILING: No stockpiled soil or material shall be placed closer than 25 feet to a <br /> property boundary. (Development Title Section 9-1415.3[bD <br /> d. PRIVATE ROADS: All private roads involved in an excavation shall be maintained to <br /> control the creation of dust. The first 100 feet of any private road on the property that <br /> intersects with a publicly maintained road shall be surfaced in a manner approved by the <br /> Director. Traffic-control and warning signs shall be installed, if required, at such <br /> intersections. The placement and size of these signs shall be approved by the Director <br /> of Pubfic,Works- (Development Title Section 9-1415.3[cp <br /> e. EROSION CONTROL_: Protective vegetative planting, silt screen dams, or other <br /> approved methods shall be required where necessary for the control.of erosion. An <br /> erosion and sediment control plan approved by Development Services Division shall be <br /> part of the reclamation plan. (Development Title Section 9-1415.3[d]) <br /> f. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be met <br /> unless otherwise modified by conditions of the Quarry Excavation Permit. (Development <br /> Title Section 9-1415.3[3]} <br /> g. HOURS OF OPERATION: Permitted excavation, processing, and loading-out activities <br /> shall be allowed to take place 24 hours per day, seven days per week. (Development <br /> Title Section 9-1415.3[f]) <br /> h. REMOVAL OF TOPSOIL: The topsoil may be removed from the site. (Development <br /> Title Section 9-1415.3[g]) <br /> i. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance <br /> with instructions from the Agricultural Commissioner of San Joaquin County. <br /> (Development Title Section 9-1415.3 [h]) <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.