� 1 <br /> t iirnmediate pdtential'for s#ructures on the'adtacent property);;tlie excavation shall <br /> E <br /> at no-time be eloserterty o the propline hdh a'lineprojected:on a slope of:one;to <br /> .one from the property line to the;tbe of slope. <br /> (6} ' Final'Sloges.: Final cut andlor fill slope.s.shal1 not exceed two (2)'feet horizontal` <br /> to one-(I) foot vertical, except asspecified below: <br /> (A).t Final slopes to a maximum of orie' and ane.=h aif1eet;horizontal to one <br /> foot .vertical may be`. maintained' when site-specific 'geologic 'and <br /> engineering analysis demonstrates'through a slope stability analysis that , ; <br /> the proposed fnal w <br /> slopes ill have a minimum.slope'stabitity'factorof <br /> safety as required in . Sectivr 9-1415.2(k)(4), while 'demonstrating <br /> suitability for the proposed end-use and protectiing..against. erosion Eby <br /> means of revegetation or other methods approved by the`Development <br /> Services Division). <br /> IF (7) Fill Slopes. Fill slopes shall .tie constructed.consistent with recommendations <br /> from a qualified civillgeotechnical engineer based upon site-specific geologic <br /> conditions. <br /> I. PONDING: All water utilized in the plant operation shall be disposed of behind a closed <br />` dike. (Development Title Section 9-1415.3[n]) <br /> M. EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan shall show the <br /> phases of excavation. Reclamation on one phase of an excavation shall be initiated <br /> prior to the start of the next excavation phase. The final reclamation of any phase of <br /> excavation shall be completed within two years of the commencement of the <br /> reclamation process. Excavation shall be limited so that at any point of time a maximum <br /> of one phase is being reclaimed while one. phase is being excavated. (Development <br /> Title Section 9-1415,3[o]) <br /> n. TIME LIMITATION: The Quarry Excavation Permit shall remain in effect as long as the <br /> excavation continues in compliance with the approved Permit but not to exceed 50 <br /> years. (Development Title Section 9-1415.3 [p]) <br /> o. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be <br /> conducted by the County to ensure compliance with the conditions of the permit and the <br /> reclamation plan. The County may use professional services as provided for in Section <br /> r 9-240.11. The consultant shall be selected by San Joaquin County. Upon completion of <br />` the annual inspection, the person in charge of the mining operation shall submit to the <br />` State Geologist and the County a report which shall contain all the information as <br />` required by Section 2207 of the Public Resources Code. The cost of the inspection shall <br /> be paid by the mine operator. Additional inspections may be conducted, but the cost of <br /> additional inspections shall be paid for by the mine operator only if non-compliance with <br /> the conditions of the Quarry Excavation Permit or the reclamation plan is found. <br /> (Development Title Section 9-1415.3[g]) <br /> P. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, compliance <br /> with conditions of approval, and compliance with County and State mining regulations, <br /> the applicant shall provide performance guarantees as a condition of the issuance of the <br /> Quarry Excavation Permit. The amount and form of the guarantee shall be subject to <br />