II. DESCRIPTION OF PROPOSED MINING OPERATION <br /> A. Map of Operation - See Attached <br /> S. Production Schedule: The estimated annual production for 1994 is <br /> 180,000 tons . The maximum design capacity of the processing plant per <br /> SJWAPCD' s permit is 1 ,106, 560 tons per year. <br /> Phase Material (Tons) value <br /> 1 22,000,000 $1, 100,000 <br /> 2 28, 000, 000 $1 ,400 ,000 <br /> 3 21,000,000 $1,050,000 <br /> 4 24, 000 , 000 $1 , 200, 000 <br /> Total 95,000; 000 $4,750,000 <br /> C. Mining Plan: <br /> I <br /> 1 . Operating Plan: Current permit expires in 1996 . Mining will be <br /> continued upon approval of this application and will continue <br /> operation year round. <br /> I <br /> 2 . Topsoil : Soil profile is essentially uniform throughout . No <br /> topsoil has been. observed. All material is to be processed. <br /> 3 . Overburden/waste/Ore: <br /> a. The mine is an open pit. I <br /> b. Material is excavated using a 9 yard loader, an excavator, a <br /> bulldozer and/or rubber tired scrapers . This equipment <br /> delivers material directly to the plant or conveyors leading <br /> to the plant. <br /> C . No blasting is anticipated. 1 <br /> d. All material will be processed. <br /> e. The maximum anticipated depth of the mine is 150 ft. <br /> f. The maximum depth between benches is 50 ft. , bench width is <br /> 12 ft. , and the maximum slope angles will be 2 : 1 . <br /> g. In this excavation, the contour created by the excavation <br /> will be the final contour required in the reclamation plan. <br /> Cuts will not create interim slopes that need backfilling <br /> during reclamation. The final contour will be created as <br /> the excavation progresses . Also, land that will not be <br /> under excavation will remain under agricultural cultivation. <br /> No earth moving will be required. At the completion the <br /> last phase (phase Iv) the additional requirement will be the <br /> removal of the equipment and structures. <br />