My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005926
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BORBA
>
8707
>
2600 - Land Use Program
>
PA-0600010
>
SU0005926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 2:30:16 PM
Creation date
9/4/2019 10:31:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005926
PE
2656
FACILITY_NAME
PA-0600010
STREET_NUMBER
8707
Direction
S
STREET_NAME
BORBA
STREET_TYPE
RD
City
STOCKTON
Zip
95206-
APN
16208002
ENTERED_DATE
2/22/2006 12:00:00 AM
SITE_LOCATION
8707 S BORBA RD
RECEIVED_DATE
1/4/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BORBA\8707\PA-0600010\SU0005926\APPL.PDF \MIGRATIONS\B\BORBA\8707\PA-0600010\SU0005926\CDD OK.PDF \MIGRATIONS\B\BORBA\8707\PA-0600010\SU0005926\EH COND.PDF \MIGRATIONS\B\BORBA\8707\PA-0600010\SU0005926\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> Electric Company" <br /> 11 . Cathodic Protection : PG & E pipelines are protected from corrosion with an " Impressed <br /> Current" cathodic protection system . Any proposed facilities , such as metal conduit , pipes , <br /> service lines , ground rods , anodes , wires , etc . that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG & E Corrosion Engineering . <br /> 12 . Pipeline Marker Signs : PG & E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines . <br /> With prior written approval from PG & E Pipeline Services , an existing PG & E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work . The pipeline marker must be moved back once construction is <br /> complete . <br /> 13 . PG & E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California . Therefore , any plans that impact PG & E ' s facilities must be reviewed and <br /> approved by PG & E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities . <br /> PG & E Gas and Electric Facilities Page 4 <br /> Public <br />
The URL can be used to link to this page
Your browser does not support the video tag.