Laserfiche WebLink
Y _- <br /> A4�s" -APPLICATION - QUARRY EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: QX- <br /> 4 PLAN - <br /> - CHEC..KLlST.`w60_01NUED, <br /> [ ] 8. describe previous mining activity,if any. <br /> G. Air Resources/Climatology: (data available from local U.S.Weather station) <br /> [ ] 1. Include a general description of the climate of the area,including the average rainfall,average snowfall,season of <br /> rainfall,average winter low temperature,average summer high temperature,and the source of the climate data. if the <br /> data were obtained from a weather station,state the location of that station. <br /> [ ] 2. Provide evidence of contact with the Air Pollution Control District regarding the need for Air Quality permits and <br /> monitoring. <br /> [ ] H. Land Use: Describe the current land use(s)of the project site(e.g.,agriculture;timber,open space, recreation,etc.). <br /> [ ] I. Aesthetics: Discuss the visual impact of the proposed mining operation from adjacent vantage points. <br /> [ j .!- Other Information: Include any other information requested by the lead:agency to assess the environmental impacts of the <br /> proposed operation. <br /> 11. DESCRIPTION OF PROPOSED MINING OPERATION <br /> [Xj A. Map of Operations5: On a map,show details of the proposed mining operation including the following applicable features: <br /> property/permit boundaries ore stockpile areas <br />' topsoil stockpile areas tailings ponds <br /> siltation ponds buildings <br /> leach pads pits{slope crest/toe and benches) <br /> haul roads wasteloverburden dumps processing facilities <br /> hazardous materials storage areas other pertinent features <br /> [X] B. Production Schedule: Provide a table of estimated annual production of orelproduct and overburden/waste. If mining will <br /> be phased,specify quantifies by phase. The annual estimated quantities should be summed to give the total anticipated <br /> production for the life of the mine. <br /> [X] C. Mining Plan: A description of how mining will be done, including any or all of the following: <br /> [X] 1. Operating Plan: Provide the proposed initiation and termination dates of the mining operation. If seasonal,provide <br /> the proposed annual months of operation. <br /> i <br /> k 2. Topsoil: Describe: <br /> {, [X] a. stripping and`handling techniques, <br /> [X] b. location and volume of proposed soil stockpiles, <br /> [X] C. how soil stockpiles will be protected from erosion(e.g., revegetated). <br /> 3. Overburden/WastelOre: Describe: <br /> [X] a- the proposed type of mine(open pit, quarry, placer,dredge,etc:.), <br /> [X] b. the type/size of mining/hauling equipment to be used, <br /> [ 1 c. the use,handling,and storage of explosives, <br /> 1 [ ] d.. the proposed method for removing overburden and ore, <br /> P:1DE1lsvelPianningAppiication Forms 'Page 8 of 18 <br /> a <br /> Quarry Excavation.doc.(Revised 04-13-08) <br />