My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008137
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BOULTON
>
401
>
2600 - Land Use Program
>
PA-1000043
>
SU0008137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:22 AM
Creation date
9/4/2019 10:31:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008137
PE
2605
FACILITY_NAME
PA-1000043
STREET_NUMBER
401
Direction
S
STREET_NAME
BOULTON
STREET_TYPE
RD
City
STOCKTON
APN
13103011
ENTERED_DATE
3/8/2010 12:00:00 AM
SITE_LOCATION
401 S BOULTON RD
RECEIVED_DATE
3/5/2010 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BOULTON\401\PA-1000043\SU0008137\APPL.PDF \MIGRATIONS\B\BOULTON\401\PA-1000043\SU0008137\CDD OK.PDF \MIGRATIONS\B\BOULTON\401\PA-1000043\SU0008137\EH COND.PDF \MIGRATIONS\B\BOULTON\401\PA-1000043\SU0008137\REV SITE PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t' ti <br /> g. EMISSIONS,:; All emissions shall be subject to the rules and regulations of the San Joaquin Valley <br /> Air Pollution Control District. (Development Title Section 9-1410.3[f]) <br /> h. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance with <br /> instructions from the Agricultural Commissioner of San Joaquin County. (Development Title Section <br /> 9-1410.3[hj) <br /> i. HEALTH CONSIDERATIONS: Excavations shall not cause health or sanitary hazards and shall not <br /> create conditions which will cause the breeding or increase of mosquito's, rodents, or other pests. <br /> (Development Title Section 9-1410.3[i]) <br /> j. COMMENCEMENT OF WORK: A written notification of work schedules shall be provided to the <br /> County by the applicant prior to initiating any grading or excavation. (Development Title Section 9- <br /> 1410.30]) <br /> '.i <br /> k. CERTIFICAt"1JON OF COMPLIANCE: At the completion of the grading, the applicant shall have a <br /> registered-i nsed surVeyoT-CMpare t eh€�xcavaions ifnal etevation"s withthe <br /> approved petmit. The engineer or surveyor shall submit a certified, written finding to the Building <br /> Official which,'states and documents the compliance or noncompliance of the excavation with the <br /> approved permit. If the project conforms with the approved permit, the Review Authority shall accept <br /> the certification and either notify the applicant that the stockpiled material may be removed or release <br /> the required performance guarantee. (Development Title Section 9-1410.3[k]) <br /> I. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion. An erosion and sediment control plan <br /> approved by-';Development Services Division shall be part of the reclamation plan. (Development <br /> Title Section„9-1410.3[m]) <br /> m. <br /> EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan shall show the phases of <br /> excavation. Neclamation on one phase of an excavation shall be initiated prior to the start of the next <br /> excavation phase. The final reclamation of any phase of excavation shall be completed within two <br /> years of the commencement of the reclamation process. Excavation shall be limited so that at any <br /> point of time,,a maximum of one phase is being reclaimed while one phase is being excavated. <br /> (Development Title Section 9-1410.3[n]) <br /> n. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted by the <br /> County to ensure compliance with the conditions of the permit and the reclamation%plan. The County <br /> may use professional services as provided for in Section 9-240.11. The consultant shall be selected <br /> by San Joagpin County. Upon completion of the annual inspection, the person in charge of the <br /> mining operaon shall submit to the State Geologist and the County a report which shall contain all <br /> the information as required by Section 2207 of the Public Resources Code. The cost of the <br /> inspection shall be paid by the mine operator. Additional inspections may be conducted, but the cost <br /> of additional inspections shall be paid for by the mine operator only if on-compliance with the <br /> conditions of-the Agricultural Excavation Permit or the reclamation plan is found. (Development Title <br /> Section 9-141,0.3[o]) <br /> o. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site,; compliance with <br /> conditions ofapproval, and compliance with County and state mining regulations, the applicant shall <br /> provide performance guarantees as a condition of the issuance of the Agricultural Excavation Permit. <br /> The amount and form of the guarantee shall be subject to annual review and approval by the County <br /> and the state;,and the amount shall be adequate to ensure reclamation of disturbed land and/or land <br /> to be distu*d during a given phase. The annual review of the financial guarantee shall be <br /> coordinated With the annual inspection and approval of successive reclamation security so that the <br /> Conditions of Approval -2 - PA-1000095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.