Laserfiche WebLink
597ATE OF CALIFORNIA—BUSINESS TRANSPORT`<,•`.:Y AND'HOUSING AGENCY <br /> GRAYDAVIS Govemo, <br /> DEPARTMENT OF TRANSP TATION <br /> P.O.BOX 2048(1976 E.CHARTER WAY) <br /> STOCKTON,CA 95201 qs� <br /> TDD (209)948-7981 <br /> PHONE (209)941-1921 <br /> FAX (209)948-7194 <br /> Flex yourpower! <br /> Be energy efficient! <br /> January 29, 2002 <br /> 10-SJ-88-12.84 <br /> Traffic Impact Mitigation <br /> Lockeford Oaks Subdivision <br /> SU-00-01 <br /> Mr. Gabe Karam <br /> Department of Public Works <br /> San Joaquin County <br /> 1810 E. Hazelton Avenue_ <br /> Stockton, CA 95205 <br /> Dear Mr. Karam: <br /> Thank you for the opportunity to review the final Traffic Impact Study (TIS) for the <br /> Proposed Lockeford Oaks Subdivision in San Joaquin County. The project site is located- _ <br /> on the northeast quadrant of the'Jack Tone Road/Brandt Road intersection, .near the � <br /> Lockeford Community. <br /> Based on the review conducted by Caltrans Travel Forecasting unit, Caltrans Planning I <br /> has determined that.this project will generate off-site traffic impact to the following <br /> intersections: State Route (SR) 88/12, SR 88/Brandt Road, and SR 88/Jack Tone Road._ <br /> These intersections will require traffic mitigation in the form of "Fare Share" <br /> contributions towards future improvements. <br /> Caltrans Planning has reviewed the consultant's TIS and the recommended equitable <br /> "Fare Share" responsibility of the project proponent towards the improvement of these <br /> intersections as traffic impact mitigation and is outlined below: <br /> SR 88/Jack Tone Road Intersection: Based on the consultant's TIS.analysis, equitable <br /> share is calculated to be 6.06% of the total cost of future improvements. It is <br /> recommended that this amount be collected from the project proponent and saved towards <br /> future intersection improvements. <br /> SR 88/Brandt Road Intersection: Based on the consultant's TIS analysis, equitable <br /> share is calculated to be 9.13% of the total cost of fixture improvements. It is <br /> recommended that this amount be collected from the project proponent and saved towards <br /> future intersection improvements. <br /> SR 12/88 Intersection: Based on the consultant's TIS analysis, equitable share is <br /> calculated to be 8.99% of the total cast of future improvements. Total estimated cost of <br /> improvement for this intersection is $2.1 million. It is recommended that the sum of <br /> "Caltrans improves rwbMy across California• <br /> 6'N%S1.KARAM.LOCKEFORD OAKS SUBMISION <br /> OKE REKE.ra s.•:. <br />